Mud Cat Solar SLF (ERCOT-25INR0505) — Project Summary

Queue ID
ERCOT-25INR0505
Capacity
100.5 MW
Technology
Solar+Battery
Status
active
Location
Lamar, TX
Region
ERCOT
Developer
Mud Cat Solar, LLC
IA Status
Facility Study

Mud Cat Solar SLF

ERCOT-25INR0505BetaActiveSolarBatteryERCOTLBNL + Live

100.5 MW hybrid in Lamar, TX · In queue since October 2023 · Proposed COD September 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

100.5 MW

Capacity

1

Components

Solar

2y 9m

In Queue

Facility Study

IA Phase

COD target: 2028

Interconnection

Total Duration

4y 11m

Facilities Study50%
Queue EntryOct 20, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-09-18

Cross-source intelligence
Beta
Low confidence·5 sources·as of 2026-06-01
Expected COD
2028-09-18
From queue filing
Developer
Mud Cat Solar, LLC
From queue filing
Status
Active
Active — early-stage Facility Study, no IA executed. ERCOTqueue.com assigns 5% build probability given lack of interconnection agreement.
Financing
Unannounced
Key milestones
IA executedMost recent

No IA — project currently in Facility Study phase

source
About

Mud Cat Solar SLF is a proposed solar generation project located in Lamar County, Texas. The project, developed by Mud Cat Solar, LLC, has a total capacity of 100.5 MW. It is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0505, with a queue entry date of October 20, 2023. The proposed commercial operation date is September 18, 2028, and the project's interconnection agreement status is currently in the Facility Study phase.

The point of interconnection for Mud Cat Solar SLF is Tap 138KV 11768 Hawk Hollow _x0013_ 1768 Deport. The project consists of 100.5 MW of solar photovoltaic generation. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Lamar

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Mud Cat Solar, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 138KV 11768 Hawk Hollow – 1768 Deport

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Mud Cat Solar SLF
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.