Briefing/projectactive
Mud Cat Solar SLF is a 101 MW Solar+Battery project in Texas, currently active.
Mud Cat Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-09-18.
- Queue ID
- ERCOT-25INR0505
- Location
- Lamar, Texas
- Technology
- Solar+Battery
- Developer
- Mud Cat Solar, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 138KV 11768 Hawk Hollow – 1768 Deport
What stands out
1
Mud Cat Solar SLF is a 101 MW Solar+Battery project in Texas with status active.
2
Mud Cat Solar, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-09-18.
Market and operating context
- Queue date
- 2023-10-20
- Proposed COD
- 2028-09-18
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.