Mud Cat Solar SLF
Type
Entity Briefing
Entity
Mud Cat Solar SLF
Generated
2026-10-19T07:50:00.736Z

Briefing on Mud Cat Solar SLF

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
101 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-09-18
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Mud Cat Solar SLF is a 101 MW Solar+Battery project in Texas, currently active.

Mud Cat Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-09-18.

Queue ID
ERCOT-25INR0505
Location
Lamar, Texas
Technology
Solar+Battery
Developer
Mud Cat Solar, LLC
Market / region
ERCOT
Point of interconnection
Tap 138KV 11768 Hawk Hollow – 1768 Deport

What stands out

1

Mud Cat Solar SLF is a 101 MW Solar+Battery project in Texas with status active.

2

Mud Cat Solar, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-09-18.

Market and operating context

Queue date
2023-10-20
Proposed COD
2028-09-18
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Mud Cat Solar SLF — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0505
LocationLamar, Texas
TechnologySolar+Battery
DeveloperMud Cat Solar, LLC
Market / regionERCOT
Point of interconnectionTap 138KV 11768 Hawk Hollow – 1768 Deport
Queue date2023-10-20
Proposed COD2028-09-18