Surfside Energy Storage (ERCOT-25INR0458) — Project Summary

Queue ID
ERCOT-25INR0458
Capacity
50.34 MW
Technology
Battery
Status
active
Location
Brazoria, TX
Region
ERCOT
Developer
Rocky Mountain Energy Holdings, LLC
IA Status
Facility Study

Surfside Energy Storage

ERCOT-25INR0458BetaActiveBatteryERCOTLBNL + Live

50.34 MW storage in Brazoria, TX · In queue since July 2023 · Proposed COD December 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

50.34 MW

Capacity

1

Components

Battery

3y 4m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 5m

Facilities Study50%
Queue EntryJul 19, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-31

Queue history
25INR0458 · 31 monthly ERCOT reports, Mar 2024 – Sep 2026

Projected COD moved

1 time

Dec 2026 → Dec 2028

Net change

+24 months

first report to latest

Capacity

50 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJul 19, 2023

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity
as of 4y 10m ago

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Project statusOperationalTeslarati · 2022-01-06
Latest activityConstruction startCultureMap Houston · 2022-01-14
Project lifecycle
as of 2022-01-14
OperationalNoAl Jazeera · 2021-03-08
TechnologyBatteryCultureMap Houston · 2022-01-14
DeveloperTeslaCultureMap Houston · 2022-01-14
GroundbreakingAnnouncedAl Jazeera · 2021-03-08

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Surfside Energy Storage project is a proposed 50.34 MW battery energy storage system in Brazoria County, Texas. Developed by Rocky Mountain Energy Holdings, LLC, the project is located within the ERCOT region and has been assigned queue ID ERCOT-25INR0458. The project entered the ERCOT interconnection queue on July 19, 2023, with a proposed commercial operation date of December 31, 2028. Its interconnection status is currently in the Facility Study phase.

The Surfside Energy Storage project has been mentioned in recent news coverage related to grid development.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Brazoria

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Rocky Mountain Energy Holdings, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 138kV 42110 Angleton – 43150 Riwood ckt 82

Data Source

LBNL + Live

DeveloperTesla Inc.±CultureMap Houston · 2022-01-14
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (3)Beta

Last updated 2026-03-26

View all articles