Surfside Energy Storage
Type
Entity Briefing
Entity
Surfside Energy Storage
Generated
2026-10-19T08:08:12.849Z

Briefing on Surfside Energy Storage

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
50 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-12-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Surfside Energy Storage is a 50 MW Battery project in Texas, currently active.

Rocky Mountain Energy Holdings, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-12-31.

Queue ID
ERCOT-25INR0458
Location
Brazoria, Texas
Technology
Battery
Developer
Rocky Mountain Energy Holdings, LLC
Market / region
ERCOT
Point of interconnection
Tap 138kV 42110 Angleton – 43150 Riwood ckt 82

What stands out

1

Surfside Energy Storage is a 50 MW Battery project in Texas with status active.

2

Rocky Mountain Energy Holdings, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-12-31.

4

Latest linked story: “Tesla surges with massive new south Houston power storage facility” (CultureMap Houston, 2022-01-14).

Market and operating context

Queue date
2023-07-19
Proposed COD
2028-12-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Surfside Energy Storage — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0458
LocationBrazoria, Texas
TechnologyBattery
DeveloperRocky Mountain Energy Holdings, LLC
Market / regionERCOT
Point of interconnectionTap 138kV 42110 Angleton – 43150 Riwood ckt 82
Queue date2023-07-19
Proposed COD2028-12-31