Waterloo Solar 1 (ERCOT-25INR0422) — Project Summary

Queue ID
ERCOT-25INR0422
Capacity
200.64 MW
Technology
Solar+Battery
Status
active
Location
Bastrop, TX
Region
ERCOT
Developer
Waterloo Solar, LLC
IA Status
IA Executed

Waterloo Solar 1

ERCOT-25INR0422BetaActiveSolarBatteryERCOTLBNL + Live

200.64 MW hybrid in Bastrop, TX · In queue since April 2023 · Proposed COD December 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

200.64 MW

Capacity

1

Components

Solar

3y 7m

In Queue

IA Executed

IA Phase

Signed Sep 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 5m

IA → COD

3y 3m

Total Duration

1y 5m

Construction75%
Queue EntryApr 19, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementSep 4, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2027-12-01

Queue history
25INR0422 · 42 monthly ERCOT reports, Apr 2023 – Sep 2026

Projected COD moved

1 time

Jun 2025 → Dec 2027

Net change

+30 months

first report to latest

Capacity

201 MW

unchanged in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedApr 19, 2023
Facilities study approvedSep 18, 2026
Interconnection agreement signedSep 4, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Dec 1, 2027
From queue filing
Developer in saved assessment
RWE Renewables
Filed as Waterloo Solar, LLC
Status at research time
Active
Active — IA executed Sept 2024, construction underway as of Jan 2026
Financing
Secured
Long-term PPA with Constellation for 140 MW offtake to supply PepsiCo, McCormick, Best Buy, and ViacomCBS operations in Texas (announced 2021-2023)

Milestones in this assessment

IA executedSep 4, 2024

Interconnection Agreement executed with ERCOT

communityimpact.com
Groundbreaking2025

Construction underway and progressing steadily as of Jan 2026

communityimpact.com
COD targetDec 2027Latest in this assessment

ERCOT capacity tracking shows 2027 target COD

ercot.com
Research sources and reasoning (4 recorded sources)

high confidence at research time

  1. communityimpact.com/austin/bastrop-cedar-creek/development/2026/01/27/construction-progresses-on-2-waterloo-solar-sites-in-bastrop-county/
  2. rwe.com/en/press/rwe-renewables/2021-08-25-rwe-teams-up-with-constellation-to-supply-major-us-commercial-customers-with-solar-energy-from-big-star-facility/
  3. ercot.com/files/docs/2025/11/06/Capacity-Changes-by-Fuel-Type-Charts_October_2025.xlsx
  4. communityimpact.com/austin/bastrop/development/2024/02/20/bastrop-county-solar-panel-project-to-go-online-in-march/

Commercial operation date: LBNL queue snapshot shows proposed COD of December 2027. No contradictory or updated COD information found in news sources. Community Impact article from Jan 2026 confirms construction is progressing but does not specify a revised target date.

Developer: LBNL filing uses 'Waterloo Solar, LLC' as the legal entity. However, RWE press release from Jan 2023 describes RWE Renewables' 'Big Star' facility in Bastrop County with identical specs (200 MW solar + 80 MW/120 MWh storage), indicating RWE is the operating parent company behind the Waterloo Solar LLC shell entity.

Status: LBNL shows 'active' status with IA executed on 2024-09-04. Community Impact article from Jan 27, 2026 confirms construction is 'steadily progressing' on the Waterloo Solar sites in Bastrop County, validating active development status.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Waterloo Solar 1 is a proposed solar generation project located in Bastrop County, Texas, with a total capacity of 200.64 MW. Developed by Waterloo Solar, LLC, the project consists entirely of solar photovoltaic generation. It is currently in the ERCOT interconnection queue as entry ERCOT-25INR0422, with a queue entry date of April 19, 2023.

The proposed commercial operation date for Waterloo Solar 1 is December 1, 2027. Its interconnection status is currently in the Facility Study phase. The point of interconnection is the AUSTROP TO GARFIELD 345kV LINE [Bus # 7040 - 7048].

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Bastrop

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Waterloo Solar, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

AUSTROP TO GARFIELD 345kV LINE [Bus # 7040 - 7048]

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.