Briefing/projectactive
Waterloo Solar 1 is a 201 MW Solar+Battery project in Texas, currently active.
Waterloo Solar, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2027-12-01.
- Queue ID
- ERCOT-25INR0422
- Location
- Bastrop, Texas
- Technology
- Solar+Battery
- Developer
- Waterloo Solar, LLC
- Market / region
- ERCOT
- Point of interconnection
- AUSTROP TO GARFIELD 345kV LINE [Bus # 7040 - 7048]
What stands out
1
Waterloo Solar 1 is a 201 MW Solar+Battery project in Texas with status active.
2
Waterloo Solar, LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2027-12-01.
Market and operating context
- Queue date
- 2023-04-19
- Proposed COD
- 2027-12-01
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.