Aldrin 138 BESS (ERCOT-25INR0421) — Project Summary

Queue ID
ERCOT-25INR0421
Capacity
207 MW
Technology
Battery
Status
active
Location
Brazoria, TX
Region
ERCOT
Developer
Aldrin Energy Storage LLC
IA Status
IA Executed

Aldrin 138 BESS

ERCOT-25INR0421BetaActiveBatteryERCOTLBNL + Live

207 MW storage in Brazoria, TX · In queue since May 2023 · Proposed COD March 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

207 MW

Capacity

1

Components

Battery

3y 6m

In Queue

IA Executed

IA Phase

Signed Apr 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

11 months

IA → COD

3y 11m

Total Duration

11 months

Construction75%
Queue EntryMay 15, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementApr 18, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2028-03-01

Queue history
25INR0421 · 41 monthly ERCOT reports, May 2023 – Sep 2026

Projected COD moved

3 times

Jul 2025 → Mar 2028

Net change

+32 months

first report to latest

Capacity

207 MW

unchanged in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMay 15, 2023
Facilities study approvedAug 22, 2025
Interconnection agreement signedApr 18, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
2026
Differs from queue: Mar 1, 2028
Developer in saved assessment
Aldrin Energy Storage LLC
From queue filing
Status at research time
Active
Active — IA executed April 2024, FIS (Facility Interconnection Study) completed per ERCOT queue tracking, construction timeline targeting 2026 COD
Financing
Not recorded

Milestones in this assessment

IA executedApr 18, 2024

Interconnection Agreement executed with ERCOT

interconnection.fyi
COD target2026Latest in this assessment

Expected commercial operation date per ERCOT reliability planning documents

ercot.com
Research sources and reasoning (7 recorded sources)

medium confidence at research time

  1. interconnection.fyi/project/ercot-25inr0421
  2. cleanview.co/power-projects/planned/battery-storage-projects/texas/25INR0421/aldrin-138-bess
  3. ercot.com/files/docs/2025/02/21/EIR%20-%20CNP%20-%20Southwest%20Houston%20345-kV%20Reliability%20Project_February_RPG.pdf
  4. ercot.com/files/docs/2024/12/06/Capacity%20Changes%20by%20Fuel%20Type%20Charts_November_2024.xlsx
  5. ercot.com/files/docs/2025/03/07/CapacityChangesbyFuelTypeCharts_February_2025.xlsx
  6. modo-content-service-prod.s3.amazonaws.com/media/reports/2024/05/22/ERCOT_BESS_buildout_report_May_2024_YwMZT0X.xlsx
  7. ercotqueue.com/project/25INR0421

Commercial operation date: LBNL shows July 2027 COD, but multiple ERCOT tracking sources (CNP Southwest Houston 345-kV Reliability Project doc, ERCOT Capacity Changes charts from Nov 2024 and Feb 2025) consistently list 2026 as the expected online date. The 1-year acceleration suggests updated interconnection timeline post-IA execution.

Developer: All sources consistently identify 'Aldrin Energy Storage LLC' as the developer with no evidence of a parent company or shell structure. No press releases, acquisitions, or corporate announcements found to indicate a separate operating entity.

Status: LBNL status 'active' with IA executed is confirmed by multiple ERCOT sources showing the project has completed both IA signing and FIS milestones, indicating advanced development stage.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Aldrin 138 BESS project is a proposed 207 MW battery storage project located in Brazoria County, Texas. Developed by Aldrin Energy Storage LLC, the project is interconnected within the ERCOT region under queue ID ERCOT-25INR0421. The project entered the interconnection queue on May 15, 2023, with a proposed commercial operation date of July 1, 2027.

The project's Interconnection Agreement (IA) has been executed as of April 18, 2024. The Point of Interconnection (POI) is at the North Alvin TNMP 138kV bus (Bus: 39015). The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Brazoria

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Aldrin Energy Storage LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

(Bus: 39015) North Alvin TNMP 138kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.