Aldrin 138 BESS is a 207 MW Battery project in Texas, currently active.
Aldrin Energy Storage LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2027-07-01.
- Queue ID
- ERCOT-25INR0421
- Location
- Brazoria, Texas
- Technology
- Battery
- Developer
- Aldrin Energy Storage LLC
- Market / region
- ERCOT
- Point of interconnection
- (Bus: 39015) North Alvin TNMP 138kV
What stands out
1
Aldrin 138 BESS is a 207 MW Battery project in Texas with status active.
2
Aldrin Energy Storage LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2027-07-01.
Market and operating context
- Queue date
- 2023-05-15
- Proposed COD
- 2027-07-01
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.