Briefing on Aldrin 138 BESS

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
207 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-07-01
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Aldrin 138 BESS is a 207 MW Battery project in Texas, currently active.

Aldrin Energy Storage LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2027-07-01.

Queue ID
ERCOT-25INR0421
Location
Brazoria, Texas
Technology
Battery
Developer
Aldrin Energy Storage LLC
Market / region
ERCOT
Point of interconnection
(Bus: 39015) North Alvin TNMP 138kV

What stands out

1

Aldrin 138 BESS is a 207 MW Battery project in Texas with status active.

2

Aldrin Energy Storage LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2027-07-01.

Market and operating context

Queue date
2023-05-15
Proposed COD
2027-07-01
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Aldrin 138 BESS — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0421
LocationBrazoria, Texas
TechnologyBattery
DeveloperAldrin Energy Storage LLC
Market / regionERCOT
Point of interconnection(Bus: 39015) North Alvin TNMP 138kV
Queue date2023-05-15
Proposed COD2027-07-01