Marengo BESS (ERCOT-25INR0419) — Project Summary

Queue ID
ERCOT-25INR0419
Capacity
120.72 MW
Technology
Battery
Status
active
Location
Cameron, TX
Region
ERCOT
Developer
BRP BLUE TOPAZ 8, LLC
IA Status
Facility Study

Marengo BESS

ERCOT-25INR0419BetaActiveBatteryERCOTLBNL

120.72 MW storage in Cameron, TX · In queue since May 2023 · Proposed COD May 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

120.72 MW

Capacity

1

Components

Battery

3y 6m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5 years

Facilities Study50%
Queue EntryMay 15, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-05-15

Queue history
25INR0419 · 36 monthly ERCOT reports, May 2023 – Apr 2026

Projected COD moved

1 time

Sep 2025 → May 2028

Net change

+32 months

first report to latest

Capacity

121 MW

unchanged in the reports

Latest stage

Cancelled

last listed Apr 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMay 15, 2023
CancelledMay 26, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
May 15, 2028
From queue filing
Developer in saved assessment
BRP Blue Topaz 8, LLC
From queue filing
Status at research time
Active
Active — Facility Study stage, no public announcements on construction or financing
Financing
Not recorded
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. renewablesinfo.org/project/ercot-25inr0419-marengo-bess
  2. interconnection.fyi/project/ercot-25inr0419
  3. ercotqueue.com/project/25INR0419
  4. modo-content-service-prod.s3.amazonaws.com/media/reports/2024/05/22/ERCOT_BESS_buildout_report_May_2024_YwMZT0X.xlsx

Commercial operation date: Only LBNL queue data provides a COD estimate (2028-05-15). No news or research findings mention construction timeline, financing, or updated COD targets for this Texas project.

Developer: All sources consistently identify 'BRP BLUE TOPAZ 8, LLC' as the developer. No parent company or operating entity is mentioned in any search results. BRP appears to be the actual developer entity, not a shell LLC.

Status: LBNL shows 'Active' status in Facility Study phase. No news coverage exists for this specific Texas project; search results primarily returned an unrelated Illinois project with the same 'Marengo BESS' name.

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Marengo BESS project is a proposed 120.72 MW battery storage project located in Cameron County, Texas. The developer is BRP BLUE TOPAZ 8, LLC. It is currently in the ERCOT interconnection queue as entry ERCOT-25INR0419, with a queue entry date of May 15, 2023, and a proposed commercial operation date of May 15, 2028. The project's interconnection agreement status is currently in the Facility Study phase.

The point of interconnection for the Marengo BESS project is the 8640 Kelvin Station 138kV (AEP). The project has appeared in recent news coverage regarding energy storage developments in Texas.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Apr 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Cameron

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

BRP BLUE TOPAZ 8, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

8640 Kelvin Station 138kV (AEP)

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.