Purple Sage BESS 2 (ERCOT-25INR0392) — Project Summary

Queue ID
ERCOT-25INR0392
Capacity
156 MW
Technology
Battery
Status
active
Location
Collin, TX
Region
ERCOT
Developer
Purple Sage, LLC
IA Status
IA Executed

Purple Sage BESS 2

ERCOT-25INR0392BetaActiveBatteryERCOTLBNL + Live

156 MW storage in Collin, TX · In queue since March 2023 · Proposed COD February 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

156 MW

Capacity

1

Components

Battery

3y 8m

In Queue

IA Executed

IA Phase

Signed Oct 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 7m

IA → COD

3y 4m

Total Duration

1y 7m

Construction75%
Queue EntryMar 8, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementOct 11, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2028-02-12

Queue history
25INR0392 · 43 monthly ERCOT reports, Mar 2023 – Sep 2026

Projected COD moved

3 times

May 2025 → Feb 2028

Net change

+33 months

first report to latest

Capacity

150 → 156 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMar 8, 2023
Facilities study approvedMar 20, 2024
Interconnection agreement signedOct 11, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
May 2027
Differs from queue: Feb 12, 2028From queue filing
Developer in saved assessment
Purple Sage, LLC
From queue filing
Status at research time
Active
Active — IA executed October 2024, on track for May 2027 COD
Financing
Not recorded

Milestones in this assessment

IA executedOct 11, 2024

Interconnection Agreement executed with ERCOT

ercot.com
COD targetMay 2027Latest in this assessment

Target commercial operation date for 156 MW battery storage facility

ftp.puc.texas.gov
Research sources and reasoning (5 recorded sources)

high confidence at research time

  1. ftp.puc.texas.gov/public/puct-info/industry/electric/reports/genplant/gentable.xls
  2. ercot.com/files/docs/2024/12/06/Capacity%20Changes%20by%20Fuel%20Type%20Charts_November_2024.xlsx
  3. ercot.com/files/docs/2025/03/07/CapacityChangesbyFuelTypeCharts_February_2025.xlsx
  4. modo-content-service-prod.s3.amazonaws.com/media/reports/2024/05/22/ERCOT_BESS_buildout_report_May_2024_YwMZT0X.xlsx
  5. cleanview.co/power-projects/planned/battery-storage-projects/texas/25INR0392/purple-sage-bess-2

Commercial operation date: LBNL proposed COD of May 2027 is consistently confirmed across multiple independent sources including Texas PUC generating plants table and ERCOT capacity charts from late 2024/early 2025, with no contradictory signals.

Developer: All sources consistently identify 'Purple Sage, LLC' as the developer with no evidence of a parent company or shell structure. No press releases or corporate announcements found to indicate a larger operating entity.

Status: LBNL status 'Active' with IA executed 2024-10-11 is confirmed by ERCOT tracking documents showing project in buildout pipeline with no withdrawal or suspension signals.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Purple Sage BESS 2 is a proposed 156 MW battery storage project in Collin County, Texas. Developed by Purple Sage, LLC, the project consists entirely of battery storage. It is currently in the ERCOT interconnection queue as entry ERCOT-25INR0392, with a queue entry date of March 8, 2023, and a proposed commercial operation date of May 30, 2027.

The project's interconnection agreement (IA) has been executed as of October 11, 2024. The point of interconnection (POI) is the Anna 345 kV Bus# 2373. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Collin

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Purple Sage, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Anna 345 kV Bus# 2373

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.