Macho Creek BESS (ERCOT-25INR0390) — Project Summary

Queue ID
ERCOT-25INR0390
Capacity
150.56 MW
Technology
Battery
Status
active
Location
Starr, TX
Region
ERCOT
Developer
Macho Creek BESS, LLC
IA Status
Facility Study

Macho Creek BESS

ERCOT-25INR0390BetaActiveBatteryERCOTLBNL

150.56 MW storage in Starr, TX · In queue since June 2023 · Proposed COD May 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

150.56 MW

Capacity

1

Components

Battery

3y 5m

In Queue

Facility Study

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 11m

Facilities Study50%
Queue EntryJun 28, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-05-31

Queue history
25INR0390 · 37 monthly ERCOT reports, Jun 2023 – Jun 2026

Projected COD moved

1 time

May 2026 → May 2027

Net change

+12 months

first report to latest

Capacity

151 MW

unchanged in the reports

Latest stage

Cancelled

last listed Jun 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJun 28, 2023
CancelledJul 16, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
May 31, 2027
From queue filing
Developer in saved assessment
—
From queue filing
Status at research time
Active
Active — Facility Study stage, no IA executed yet. Ercotqueue.com assigns 5% build-chance probability given lack of IA.
Financing
Not recorded

Milestones in this assessment

COD targetMay 30, 2026

Original proposed completion date before 1-year delay

interconnectionfyi.substack.com
COD targetMay 30, 2027Latest in this assessment

Revised proposed completion date (Dec 2024 update)

interconnectionfyi.substack.com
Research sources and reasoning (5 recorded sources)

medium confidence at research time

  1. cleanview.co/power-projects/planned/battery-storage-projects/texas/25INR0390/macho-creek-bess
  2. interconnection.fyi/project/ercot-25inr0390
  3. interconnectionfyi.substack.com/p/interconnectionfyi-weekly-digest
  4. ercotqueue.com/project/25INR0390
  5. corporationwiki.com/p/3f6llh/christopher-hickey

Commercial operation date: LBNL queue shows May 31, 2027 COD. Interconnection.fyi newsletter (Dec 2024) notes the proposed completion changed from May 30, 2026 to May 30, 2027, confirming a 1-year delay. No more recent developer announcements found to contradict this date.

Developer: LBNL filing entity is 'Macho Creek BESS, LLC' — a project-specific shell LLC. CorporationWiki shows Christopher Hickey as governing person for this and multiple other BESS LLCs (Bobcat BESS, Bluegill BESS, Mesa View Storage, Granite Source Power), suggesting a serial developer or development platform, but no parent operating company is publicly identified in search results.

Status: LBNL status is 'active' at Facility Study stage with no IA date. All aggregator sites (Cleanview, Interconnection.fyi, ercotqueue.com) confirm active queue status with no construction or financing announcements.

About

Saved background

Generated Apr 10, 2026 · Predates Jun 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Macho Creek BESS project is a proposed 150.56 MW battery storage project located in Starr County, Texas. Developed by Macho Creek BESS, LLC, the project consists entirely of battery storage. It is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0390, with a queue entry date of June 28, 2023.

The proposed commercial operation date for the Macho Creek BESS project is May 31, 2027. Its interconnection status is currently in the Facility Study phase. The point of interconnection is Tap 138kV 8793 RIO GRANDE CITY - 8806 LAS LOMAS.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Jun 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Starr

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Macho Creek BESS, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 138kV 8793 RIO GRANDE CITY - 8806 LAS LOMAS

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
LV4_UNIT_1
POI Substation
Rio Grande City Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.