Stoneridge BESS (ERCOT-25INR0389) — Project Summary

Queue ID
ERCOT-25INR0389
Capacity
101.9 MW
Technology
Battery
Status
active
Location
Milam, TX
Region
ERCOT
Developer
Stoneridge Solar, LLC
IA Status
IA Executed

Stoneridge BESS

ERCOT-25INR0389BetaActiveBatteryERCOTLBNL + Live

101.9 MW storage in Milam, TX · In queue since March 2023 · Proposed COD December 2026

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

101.9 MW

Capacity

1

Components

Battery

3y 8m

In Queue

IA Executed

IA Phase

Signed Apr 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 1m

IA → COD

2y 8m

Total Duration

1y 1m

Construction75%
Queue EntryMar 13, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementApr 19, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2026-12-31

Queue history
25INR0389 · 43 monthly ERCOT reports, Mar 2023 – Sep 2026

Projected COD moved

4 times

Feb 2025 → Dec 2026

Net change

+22 months

first report to latest

Capacity

106 → 102 MW

changed in the reports

Latest stage

Synchronized

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMar 13, 2023
Facilities study approvedSep 6, 2024
Interconnection agreement signedApr 19, 2024
Approved for energizationJun 26, 2025
Approved for synchronizationJul 10, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Nov 2025
Differs from queue: Dec 31, 2026
Developer in saved assessment
RWE Clean Energy
Filed as Stoneridge Solar, LLC
Status at research time
Online
Online — commissioned November 2025 as 100MW/200MWh BESS co-located with 200MW solar
Financing
Secured
Financing secured (construction completed and commissioned November 2025); specific financing terms not publicly disclosed in available sources

Milestones in this assessment

IA executedApr 19, 2024

Interconnection Agreement executed with ERCOT

interconnection.fyi
GroundbreakingOct 2024

RWE broke ground on Stoneridge BESS as part of 450 MW BESS construction program in Texas

rwe.com
COD targetNov 2025Latest in this assessment

RWE commissioned 100MW/200MWh Stoneridge BESS co-located with 200MW solar PV

pv-tech.org
Research sources and reasoning (5 recorded sources)

high confidence at research time

  1. pv-tech.org/rwe-commissions-200mw-100mw-200mwh-solar-plus-storage-project-texas/
  2. rwe.com/en/press/rwe-clean-energy/2024-10-02-rwe-starts-construction-of-450-mw-bess-in-the-us/
  3. energy-storage.news/rwe-commissions-texas-solar-plus-storage-project/
  4. solarbuildermag.com/projects/stoneridge-solar-adds-200-mw-to-texas-grid-projects-weekly/
  5. rwe.com/en/press/rwe-americas/2026-03-05-rwe-commissions-2-gw-of-new-energy-projects-in-the-us/

Commercial operation date: LBNL proposed COD was April 2026, but RWE press releases confirm the project was commissioned in November 2025 (PV Tech Nov 27, RWE Mar 5 2026 retrospective). The BESS came online 5 months earlier than the queue filing indicated.

Developer: LBNL filing entity is 'Stoneridge Solar, LLC' (project-specific LLC), but all press releases and commissioning announcements identify RWE Clean Energy as the developer and owner. No acquisition occurred; RWE developed the project under the shell entity.

Status: LBNL shows 'active' with IA executed April 2024, but multiple independent sources (RWE press releases, PV Tech, Energy-Storage.News) confirm the project was commissioned and brought online in November 2025.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Stoneridge BESS is a proposed 101.9 MW battery storage project located in Milam County, Texas. The project, developed by Stoneridge Solar, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0389, with a queue entry date of March 13, 2023. The proposed commercial operation date is April 1, 2026.

The project's interconnection agreement (IA) has been executed as of April 19, 2024. The point of interconnection (POI) is at the Tap 345 kV 13429 SANDOW SWITCH - 7040 AUSTROP CKT 2.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Milam

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Stoneridge Solar, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345 kV 13429 SANDOW SWITCH - 7040 AUSTROP CKT 2

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.