Query
Stoneridge BESS
Type
Entity Briefing
Entity
Stoneridge BESS
State
TN
Technology
battery
Generated
2026-10-19T23:58:03.383Z

Briefing on Stoneridge BESS

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
102 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2026-04-01
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Stoneridge BESS is a 102 MW Battery project in Texas, currently active.

Stoneridge Solar, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-04-01.

Queue ID
ERCOT-25INR0389
Location
Milam, Texas
Technology
Battery
Developer
Stoneridge Solar, LLC
Market / region
ERCOT
Point of interconnection
Tap 345 kV 13429 SANDOW SWITCH - 7040 AUSTROP CKT 2

What stands out

1

Stoneridge BESS is a 102 MW Battery project in Texas with status active.

2

Stoneridge Solar, LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2026-04-01.

Market and operating context

Queue date
2023-03-13
Proposed COD
2026-04-01
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Stoneridge BESS — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0389
LocationMilam, Texas
TechnologyBattery
DeveloperStoneridge Solar, LLC
Market / regionERCOT
Point of interconnectionTap 345 kV 13429 SANDOW SWITCH - 7040 AUSTROP CKT 2
Queue date2023-03-13
Proposed COD2026-04-01