Les Energy Storage (ERCOT-25INR0338) — Project Summary

Queue ID
ERCOT-25INR0338
Capacity
205.13 MW
Technology
Battery
Status
active
Location
Howard, TX
Region
ERCOT
Developer
Rocky Mountain Energy Development, LLC
IA Status
Facility Study

Les Energy Storage

ERCOT-25INR0338BetaActiveBatteryERCOTLBNL + Live

205.13 MW storage in Howard, TX · In queue since February 2023 · Proposed COD April 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

205.13 MW

Capacity

1

Components

Battery

3y 9m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 2m

Facilities Study50%
Queue EntryFeb 9, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Completed, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-04-30

Queue history
25INR0338 · 44 monthly ERCOT reports, Feb 2023 – Sep 2026

Projected COD moved

4 times

Feb 2026 → Apr 2028

Net change

+26 months

first report to latest

Capacity

201 → 205 MW

changed in the reports

Latest stage

Facilities study done

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedFeb 9, 2023
Facilities study approvedJun 9, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Apr 2028
From queue filing
Developer in saved assessment
Rocky Mountain Energy Development, LLC
From queue filing
Status at research time
Active
Active — Facility Study stage, no public construction or financing announcements
Financing
Not recorded

Milestones in this assessment

COD targetApr 2028Latest in this assessment

Proposed commercial operation date April 2028 per ERCOT queue filing

cleanview.co
Research sources and reasoning (3 recorded sources)

low confidence at research time

  1. cleanview.co/planned-battery-projects/TX/25INR0338/les-energy-storage
  2. interconnection.fyi/projects/state/TX/howard-county
  3. modo-content-service-prod.s3.amazonaws.com/media/reports/2024/05/22/ERCOT_BESS_buildout_report_May_2024_YwMZT0X.xlsx

Commercial operation date: LBNL queue filing shows April 2028 COD. No press releases, financing announcements, or developer updates found in search results to validate or contradict this date. Cleanview aggregator confirms same target.

Developer: LBNL filing entity 'Rocky Mountain Energy Development, LLC' appears to be the actual developer, not a project-specific shell LLC. No press releases or corporate announcements found to identify a parent company or operating entity.

Status: LBNL shows 'active' status in Facility Study phase. No news coverage of groundbreaking, financing, or development milestones found. Project appears to be in early interconnection-study phase.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Les Energy Storage project is a proposed 205.13 MW battery storage project in Howard County, Texas. Developed by Rocky Mountain Energy Development, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0338, with a queue entry date of February 9, 2023. The proposed commercial operation date is April 30, 2028, and the project's interconnection agreement status is currently in the Facility Study phase.

The point of interconnection is Tap 138 kV 1326 Stanton East _x0013_ 11324 Leatherwood Pod. The Les Energy Storage project has been mentioned in recent industry news.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Howard

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Rocky Mountain Energy Development, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 138 kV 1326 Stanton East – 11324 Leatherwood Pod

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.