Briefing/projectactive
Les Energy Storage is a 205 MW Battery project in Texas, currently active.
Rocky Mountain Energy Development, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-04-30.
- Queue ID
- ERCOT-25INR0338
- Location
- Howard, Texas
- Technology
- Battery
- Developer
- Rocky Mountain Energy Development, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 138 kV 1326 Stanton East – 11324 Leatherwood Pod
What stands out
1
Les Energy Storage is a 205 MW Battery project in Texas with status active.
2
Rocky Mountain Energy Development, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-04-30.
Market and operating context
- Queue date
- 2023-02-09
- Proposed COD
- 2028-04-30
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.