Query
Les Energy Storage
Type
Entity Briefing
Entity
Les Energy Storage
Technology
battery
Generated
2026-10-19T17:25:33.710Z

Briefing on Les Energy Storage

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
205 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-04-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Les Energy Storage is a 205 MW Battery project in Texas, currently active.

Rocky Mountain Energy Development, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-04-30.

Queue ID
ERCOT-25INR0338
Location
Howard, Texas
Technology
Battery
Developer
Rocky Mountain Energy Development, LLC
Market / region
ERCOT
Point of interconnection
Tap 138 kV 1326 Stanton East – 11324 Leatherwood Pod

What stands out

1

Les Energy Storage is a 205 MW Battery project in Texas with status active.

2

Rocky Mountain Energy Development, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-04-30.

Market and operating context

Queue date
2023-02-09
Proposed COD
2028-04-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Les Energy Storage — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0338
LocationHoward, Texas
TechnologyBattery
DeveloperRocky Mountain Energy Development, LLC
Market / regionERCOT
Point of interconnectionTap 138 kV 1326 Stanton East – 11324 Leatherwood Pod
Queue date2023-02-09
Proposed COD2028-04-30