Red Top Solar I
200.59 MW generation in Young, TX · In queue since January 2023 · Proposed COD April 2029
200.59 MW
Capacity
1
Components
Solar
3y 10m
In Queue
Facility Study
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
6y 3m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Completed, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-04-20
Projected COD moved
5 times
Jun 2026 → Apr 2029
Net change
+34 months
first report to latest
Capacity
200 → 201 MW
changed in the reports
Latest stage
Facilities study done
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Entered ERCOT queue, currently in Facility Study phase
ercotqueue.comResearch sources and reasoning (4 recorded sources)
low confidence at research time
- interconnection.fyi/project/ercot-25inr0306
- ercotqueue.com/project/25INR0306
- ercotqueue.com/developer/cat-red-top-solar-llc
- renewablesinfo.org/project/ercot-25inr0306-red-top-solar-i
Commercial operation date: Only LBNL queue data provides a COD target of November 2028. No news coverage or press releases found discussing project timeline or construction plans.
Developer: Only LBNL filing identifies 'Cat Red Top Solar, LLC' as developer. No news coverage found to confirm parent company or operating entity. The 'Cat' prefix suggests possible project-LLC structure but no parent company identified in available sources.
Status: LBNL shows 'active' status in Facility Study phase. No news coverage found to indicate construction activity, permitting progress, or project advancement beyond interconnection studies.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Red Top Solar I is a proposed solar generation project located in Young County, Texas, within the ERCOT region. The project, developed by Cat Red Top Solar, LLC, has a total capacity of 200.59 MW. It consists solely of solar photovoltaic generation.
The project is listed in the ERCOT interconnection queue as entry ERCOT-25INR0306, with a queue entry date of January 17, 2023. The proposed commercial operation date is November 30, 2028, and the project's interconnection agreement status is currently in the Facility Study phase. The point of interconnection is Tap 138kV 1431 Graham SES - Short Grass 11525. The project has been mentioned in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Young
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Cat Red Top Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138kV 1431 Graham SES - Short Grass 11525
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.