Briefing on Red Top Solar I

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
201 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2028-11-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Red Top Solar I is a 201 MW Solar project in Texas, currently active.

Cat Red Top Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-11-30.

Queue ID
ERCOT-25INR0306
Location
Young, Texas
Technology
Solar
Developer
Cat Red Top Solar, LLC
Market / region
ERCOT
Point of interconnection
Tap 138kV 1431 Graham SES - Short Grass 11525

What stands out

1

Red Top Solar I is a 201 MW Solar project in Texas with status active.

2

Cat Red Top Solar, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-11-30.

Market and operating context

Queue date
2023-01-17
Proposed COD
2028-11-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Red Top Solar I — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0306
LocationYoung, Texas
TechnologySolar
DeveloperCat Red Top Solar, LLC
Market / regionERCOT
Point of interconnectionTap 138kV 1431 Graham SES - Short Grass 11525
Queue date2023-01-17
Proposed COD2028-11-30