RIVERBEND SOLAR SLF
301.6 MW hybrid in Falls, TX · In queue since March 2023 · Proposed COD December 2027
301.6 MW
Capacity
1
Components
Solar
3y 8m
In Queue
Facility Study
IA Phase
COD target: 2027
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 9m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-12-31
Projected COD moved
4 times
Nov 2025 → Dec 2027
Net change
+25 months
first report to latest
Capacity
305 → 302 MW
changed in the reports
Latest stage
Facilities study done
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (5 recorded sources)
low confidence at research time
- nexamp.com/riverbend-solar-storage
- infrasure.ai/project/ercot-25inr0297-riverbend-solar-slf
- interconnection.fyi/project/ercot-25inr0297
- ercotqueue.com/project/25INR0297
- cleanview.co/power-projects/planned/battery-storage-projects/texas/25INR0311/riverbend-storage-slf
Commercial operation date: Only the LBNL/ERCOT queue date of 2027-12-31 is available. The aggregator sites (infrasure, interconnection.fyi) repeat it from the queue, so they are not independent. The Nexamp page gives no COD, and cleanview's 'expected online 2027' for the companion storage project is consistent with it. Infrasure also mentions a 'June 29, 2027' completion date update, but the excerpt is garbled and unconfirmed.
Developer: Nexamp hosts a project page for 'Riverbend Solar & Storage' in Falls County, TX: about 300 MW on about 1,900 acres, which matches the queue entry's size and location. Riverbend Renewables, LLC appears to be the project-LLC filing entity. The snippet does not explicitly state the ownership relationship, so the link is inferred.
Status: The LBNL status is 'active' and is consistent with ercotqueue.com (no IA, active) and the Nexamp page, which calls the project 'proposed'. The interxdata snippet saying 'operational' conflicts with every other source and with is_operational=false, so it is likely an error.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Riverbend Solar SLF project is a proposed 301 MW solar generation facility in Falls County, Texas. The project, being developed by Riverbend Renewables, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0297, with a queue entry date of March 8, 2023. The proposed commercial operation date is December 31, 2027.
The project's interconnection status is currently in the Facility Study phase. The point of interconnection is the TAP 345 KV line between the Tradinghouse (#3405) and Temple Pecan Creek (#3412) substations. The project has appeared in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Falls
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Riverbend Renewables, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
TAP 345 KV LINE FROM TRADINGHOUSE (#3405) TO TEMPLE PECAN CREEK (#3412) SUBSTATIONS
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Queue projects in Texas
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.