City Breeze BESS (ERCOT-25INR0271) — Project Summary

Queue ID
ERCOT-25INR0271
Capacity
143.1 MW
Technology
Battery
Status
active
Location
Matagorda, TX
Region
ERCOT
Developer
City Breeze BESS LLC
IA Status
IA Executed

City Breeze BESS

ERCOT-25INR0271BetaActiveBatteryERCOTLBNL + Live

143.1 MW storage in Matagorda, TX · In queue since December 2022 · Proposed COD March 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

143.1 MW

Capacity

1

Components

Battery

3y 11m

In Queue

IA Executed

IA Phase

Signed May 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 5m

IA → COD

2y 10m

Total Duration

1y 5m

Construction75%
Queue EntryDec 15, 2022

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementMay 15, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2027-03-18

Queue history
25INR0271 · 46 monthly ERCOT reports, Dec 2022 – Sep 2026

Projected COD moved

4 times

Dec 2025 → Mar 2027

Net change

+15 months

first report to latest

Capacity

101 → 143 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedDec 15, 2022
Facilities study approvedJun 2, 2026
Interconnection agreement signedMay 15, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Jul 15, 2026
Differs from queue: Mar 18, 2027
Developer in saved assessment
Zenobe
Filed as City Breeze BESS LLC
Status at research time
IA Executed
IA Executed — interconnection agreement amended/restated with AEP Texas in October 2024, project advancing toward 2026 COD
Financing
In progress
Bay City Tribune (Feb 2026) reports 'secured a new round of financing' for the 235-megawatt facility, but no close details or lead financier disclosed

Milestones in this assessment

IA executedMay 15, 2024

Original IA executed with AEP Texas, later amended/restated October 2024

interchange.puc.texas.gov
Financing closeFeb 2026

New round of financing secured as project moves forward

baycitytribune.com
COD targetJul 15, 2026Latest in this assessment

ERCOT interconnection study lists updated COD target

ercot.com
Research sources and reasoning (5 recorded sources)

high confidence at research time

  1. baycitytribune.com/news/235-megawatt-battery-storage-facility-in-matagorda-county-moves-forward/article_03739a84-d462-44f8-9de7-d77bddcd58f4.html
  2. ercot.com/files/docs/2025/02/21/EIR%20-%20CNP%20-%20Southwest%20Houston%20345-kV%20Reliability%20Project_February_RPG.pdf
  3. modo-content-service-prod.s3.amazonaws.com/media/reports/2024/09/26/ERCOT_BESS_Buildout_Report_August_2024.xlsx
  4. interchange.puc.texas.gov/search/documents/?controlNumber=35077&itemNumber=1953
  5. ercot.com/files/docs/2025/03/07/CapacityChangesbyFuelTypeCharts_February_2025.xlsx

Commercial operation date: LBNL queue shows 2027-03-18, but ERCOT's February 2025 Southwest Houston 345-kV Reliability Project document lists City Breeze BESS with COD 07/15/2026 (140.6 MW). This is an 8-month earlier target, reflecting updated interconnection study timelines.

Developer: LBNL filing entity is 'City Breeze BESS LLC' (project shell). Modo Energy's August 2024 ERCOT BESS Buildout Report explicitly lists 'Zenobe City Breeze BESS' as the developer name, indicating Zenobe Energy is the parent/operating company.

Status: LBNL status 'Active' with IA executed 2024-05-15 is confirmed. Texas PUC filing 35077-1953 shows First Amended & Restated ERCOT Standard Generation Interconnection Agreement filed October 2024, indicating active progression.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The City Breeze BESS project is a proposed 140.6 MW battery storage project located in Matagorda County, Texas. The project, developed by City Breeze BESS LLC, interconnected to the ERCOT grid at the 8111 MAGILL4A 138KV point of interconnection. It entered the ERCOT interconnection queue as queue ID ERCOT-25INR0271 on December 15, 2022, and has a proposed commercial operation date of March 18, 2027.

The project's Interconnection Agreement (IA) was executed on May 15, 2024. The project has appeared in recent news coverage regarding energy storage development in Texas.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Matagorda

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

City Breeze BESS LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

8111 MAGILL4A 138KV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.