Harryoung Solar (ERCOT-25INR0270) — Project Summary

Queue ID
ERCOT-25INR0270
Capacity
190.01 MW
Technology
Solar+Battery
Status
active
Location
Cameron, TX
Region
ERCOT
Developer
Gransolar Texas Four LLC
IA Status
Facility Study

Harryoung Solar

ERCOT-25INR0270BetaActiveSolarBatteryERCOTLBNL + Live

190.01 MW hybrid in Cameron, TX · In queue since November 2022 · Proposed COD May 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

190.01 MW

Capacity

1

Components

Solar

4 years

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 6m

Facilities Study50%
Queue EntryNov 23, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-05-15

Queue history
25INR0270 · 35 monthly ERCOT reports, Nov 2023 – Sep 2026

Projected COD moved

1 time

May 2027 → May 2028

Net change

+12 months

first report to latest

Capacity

190 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedNov 23, 2022

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
May 15, 2028
From queue filing
Developer in saved assessment
Gransolar Group
Filed as Gransolar Texas Four LLC
Status at research time
Active
Active — Facility Study stage, no IA executed yet. Multiple queue trackers assess build probability at 5%.
Financing
Not recorded

Milestones in this assessment

COD targetMay 14, 2027

Original proposed completion date before being pushed to May 2028

interconnectionfyi.substack.com
COD targetMay 15, 2028Latest in this assessment

Current proposed completion date per ERCOT queue

interconnection.fyi
Research sources and reasoning (5 recorded sources)

medium confidence at research time

  1. interconnection.fyi/project/ercot-25inr0270
  2. interconnectionfyi.substack.com/p/interconnection-weekly-project-updates-db7
  3. renewablesinfo.org/browse/owner/gransolar-group-grs
  4. ercotqueue.com/developer/gransolar-texas-four-llc
  5. ercotqueue.com/project/25INR0270

Commercial operation date: LBNL queue snapshot shows proposed COD of May 15, 2028. One search result notes the date was pushed back from May 14, 2027 to May 14, 2028 (slight date discrepancy but same timeframe). No independent news sources with alternative dates found.

Developer: LBNL filing entity is 'Gransolar Texas Four LLC', a project-specific LLC. Search results identify the parent as 'Gransolar Group (GRS)' which owns multiple Texas projects through numbered LLCs.

Status: LBNL shows 'active' status at Facility Study stage with no IA date. Third-party queue analytics (ercotqueue.com) note 'No IA' and low 5% build-chance, indicating early-stage development with no major milestones achieved.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Harryoung Solar project is a proposed 190.01 MW solar generation facility in Cameron County, Texas. The project, developed by Gransolar Texas Four LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0270, with a queue entry date of November 23, 2022. The proposed commercial operation date is May 15, 2028, and the project's interconnection agreement status is currently in the Facility Study phase.

The point of interconnection for the Harryoung Solar project is Tap 8319 Rio Hondo - SOUTH SANTA ROSA: 8359, 138kV. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Cameron

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Gransolar Texas Four LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 8319 Rio Hondo - SOUTH SANTA ROSA: 8359, 138kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Rio Hondo Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.