Shepard Energy Storage (ERCOT-25INR0262) — Project Summary

Queue ID
ERCOT-25INR0262
Capacity
256.79 MW
Technology
Battery
Status
active
Location
Galveston, TX
Region
ERCOT
Developer
Shepard Energy Storage LLC
IA Status
IA Executed

Shepard Energy Storage

ERCOT-25INR0262BetaActiveBatteryERCOTLBNL + Live

256.79 MW storage in Galveston, TX · In queue since December 2022 · Proposed COD June 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

256.79 MW

Capacity

1

Components

Battery

3y 11m

In Queue

IA Executed

IA Phase

Signed Jan 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 1m

IA → COD

4y 5m

Total Duration

1y 1m

Construction75%
Queue EntryDec 15, 2022

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementJan 17, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2028-06-30

Queue history
25INR0262 · 46 monthly ERCOT reports, Dec 2022 – Sep 2026

Projected COD moved

6 times

Jul 2025 → Jun 2028

Net change

+35 months

first report to latest

Capacity

263 → 257 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedDec 15, 2022
Facilities study approvedMar 19, 2026
Interconnection agreement signedJan 17, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Jul 1, 2027
Differs from queue: Jun 30, 2028From queue filing
Developer in saved assessment
Vesper Energy
Filed as Shepard Energy Storage LLC
Status at research time
IA Executed
IA Executed — community engagement ongoing, October 2024 open house held in Dickinson, TX
Financing
Not recorded

Milestones in this assessment

IA executedJan 17, 2024

Interconnection Agreement executed with ERCOT

houston.org
COD targetJul 1, 2027Latest in this assessment

Proposed commercial operation date per LBNL queue

shepardenergystorage.com
Research sources and reasoning (4 recorded sources)

medium confidence at research time

  1. shepardenergystorage.com/
  2. linkedin.com/posts/vesperenergy_energystorage-gridresilience-texasenergy-activity-7303459800552493057-QDVU
  3. instagram.com/p/DQMdlFGk_a_/
  4. cleanview.co/power-projects/planned/battery-storage-projects/texas/25INR0262/shepard-energy-storage

Commercial operation date: LBNL queue snapshot shows proposed COD of 2027-07-01. No contradicting or confirming dates found in news/web sources; project website and social media mention 250 MW project but provide no COD updates.

Developer: LBNL filing entity is 'Shepard Energy Storage LLC' (project-specific shell). LinkedIn post from March 2025 explicitly attributes the project to Vesper Energy, identifying them as the operating developer behind Shepard Energy Storage.

Status: LBNL shows IA executed January 2024. Instagram post from October 2024 confirms active community outreach with open house event, indicating project remains in pre-construction development phase.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Shepard Energy Storage is a proposed 260.22 MW battery storage project located in Galveston County, Texas. The project, developed by Shepard Energy Storage LLC, is interconnected within the ERCOT region under queue ID ERCOT-25INR0262. It entered the interconnection queue on December 15, 2022, with a proposed commercial operation date of July 1, 2027. The project's Interconnection Agreement (IA) was executed on January 17, 2024.

The proposed project consists entirely of battery storage with a total capacity of 260.22 MW. The point of interconnection is the Hidden Lakes 138kV substation (Bus# 38900). Shepard Energy Storage has been the subject of recent news coverage, with three articles categorized under the industry sector.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Galveston

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Shepard Energy Storage LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Hidden Lakes 138kV substation (Bus# 38900)

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Substation 41

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.