Briefing/projectactive
Shepard Energy Storage is a 257 MW Battery project in Texas, currently active.
Shepard Energy Storage LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2027-07-01.
- Queue ID
- ERCOT-25INR0262
- Location
- Galveston, Texas
- Technology
- Battery
- Developer
- Shepard Energy Storage LLC
- Market / region
- ERCOT
- Point of interconnection
- Hidden Lakes 138kV substation (Bus# 38900)
What stands out
1
Shepard Energy Storage is a 257 MW Battery project in Texas with status active.
2
Shepard Energy Storage LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2027-07-01.
Market and operating context
- Queue date
- 2022-12-15
- Proposed COD
- 2027-07-01
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.