Hector Solar (ERCOT-25INR0220) — Project Summary

Queue ID
ERCOT-25INR0220
Capacity
81.59 MW
Technology
Solar+Battery
Status
active
Location
Navarro, TX
Region
ERCOT
Developer
Hector Solar, LLC
IA Status
Facility Study

Hector Solar

ERCOT-25INR0220BetaActiveSolarBatteryERCOTLBNL + Live

81.59 MW hybrid in Navarro, TX · In queue since October 2022 · Proposed COD October 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

81.59 MW

Capacity

1

Components

Solar

4y 1m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

6 years

Facilities Study50%
Queue EntryOct 24, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-10-08

Queue history
25INR0220 · 45 monthly ERCOT reports, Jan 2023 – Sep 2026

Projected COD moved

2 times

Dec 2025 → Oct 2028

Net change

+34 months

first report to latest

Capacity

82 → 82 MW

changed in the reports

Latest stage

Facilities study done

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedOct 24, 2022
Facilities study approvedApr 22, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity
as of 2y 7m ago

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest activityConstruction startEl Paso Times · 2024-04-23
Project lifecycle
as of 2024-04-23
PhaseConstructionEl Paso Times · 2024-04-23
OperationalNoEl Paso Times · 2024-04-23
TechnologySolarEl Paso Times · 2024-04-23
DeveloperEl Paso ElectricEl Paso Times · 2024-04-23
GroundbreakingAnnouncedEl Paso Times · 2024-04-23

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Hector Solar is a proposed 81.59 MW solar generation project located in Navarro County, Texas. The project, developed by Hector Solar, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0220, with a queue entry date of October 24, 2022. The proposed commercial operation date is December 31, 2027. The project's interconnection status is currently in the Facility Study phase, and the point of interconnection is the Haney (213) - Hubbard_8 (3515) 138kV Line.

The Hector Solar project has been mentioned in recent news articles related to deals and industry developments.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Navarro

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Hector Solar, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Haney (213) - Hubbard_8 (3515) 138kV Line

Data Source

LBNL + Live

CompanyEl Paso ElectricEl Paso Times · 2024-04-23
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.