Hector Solar
Type
Entity Briefing
Entity
Hector Solar
Generated
2026-10-19T14:45:51.787Z

Briefing on Hector Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
82 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2027-12-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Hector Solar is a 82 MW Solar+Battery project in Texas, currently active.

Hector Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-12-31.

Queue ID
ERCOT-25INR0220
Location
Navarro, Texas
Technology
Solar+Battery
Developer
Hector Solar, LLC
Market / region
ERCOT
Point of interconnection
Haney (213) - Hubbard_8 (3515) 138kV Line

What stands out

1

Hector Solar is a 82 MW Solar+Battery project in Texas with status active.

2

Hector Solar, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-12-31.

4

Latest linked story: “Construction begins on El Paso's largest solar plant” (El Paso Times, 2024-04-23).

Market and operating context

Queue date
2022-10-24
Proposed COD
2027-12-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Hector Solar — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0220
LocationNavarro, Texas
TechnologySolar+Battery
DeveloperHector Solar, LLC
Market / regionERCOT
Point of interconnectionHaney (213) - Hubbard_8 (3515) 138kV Line
Queue date2022-10-24
Proposed COD2027-12-31