Briefing/projectactive
Hector Solar is a 82 MW Solar+Battery project in Texas, currently active.
Hector Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-12-31.
- Queue ID
- ERCOT-25INR0220
- Location
- Navarro, Texas
- Technology
- Solar+Battery
- Developer
- Hector Solar, LLC
- Market / region
- ERCOT
- Point of interconnection
- Haney (213) - Hubbard_8 (3515) 138kV Line
What stands out
1
Hector Solar is a 82 MW Solar+Battery project in Texas with status active.
2
Hector Solar, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2027-12-31.
4
Latest linked story: “Construction begins on El Paso's largest solar plant” (El Paso Times, 2024-04-23).
Market and operating context
- Queue date
- 2022-10-24
- Proposed COD
- 2027-12-31
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.