Bottom Grass Solar II
401.6 MW hybrid in Colorado, TX · In queue since November 2022 · Proposed COD March 2028
401.6 MW
Capacity
1
Components
Solar
4 years
In Queue
Facility Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
5y 4m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-03-01
Projected COD moved
5 times
Mar 2025 → Mar 2028
Net change
+36 months
first report to latest
Capacity
402 MW
unchanged in the reports
Latest stage
Cancelled
last listed Dec 2025
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (5 recorded sources)
low confidence at research time
- infrasure.ai/project/ercot-25inr0152-bottom-grass-solar-ii
- interxdata.com/projects/bottom-grass-solar-ii-ercot-25inr0152/
- interconnection.fyi/project/ercot-25inr0152
- interconnection.fyi/project/ercot-23inr0082
- facebook.com/groups/3162400907401094/posts/3975178416123335/
Commercial operation date: Only the LBNL/ERCOT filing date (2028-03-01) is supported. The Infrasure page repeats it ('Proposed COD March 2028'), but that page appears to be generated from the same queue data. Its narrative text also says December 1, 2026, which is inconsistent. No press release or news gives an independent, financing-backed COD.
Developer: Every source names Flint Rock Solar Project, LLC, and a Facebook snippet mentions 'Flint Rock Solar, LLC'. This looks like a project shell, and no parent or operating company is identified. The sibling Bottom Grass Solar (23INR0082) is owned by 'Bottom Grass Solar Project, LLC', which fits the same shell pattern.
Status: LBNL, Infrasure and InterXData all show 'active' with IA status Facility Study. The interconnection.fyi 'withdrawn' label is a single unverified outlier and may be confused with the withdrawn sibling project Bottom Grass Solar (23INR0082). A Facebook snippet lists 'Bottom Grass Solar II - Colorado - 01/28/2026 ... Flint Rock Solar, LLC Application Phase', which hints at ongoing county-level activity but is not conclusive.
About
Generated Apr 10, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Bottom Grass Solar II is a proposed solar generation project located in Colorado County, Texas, within the ERCOT region. The project, developed by Flint Rock Solar Project, LLC, has a total capacity of 401.6 MW.
The project is currently active in the ERCOT interconnection queue under queue ID ERCOT-25INR0152, with an entry date of November 7, 2022. The proposed commercial operation date is December 1, 2026, and the project's interconnection agreement status is currently in the Facility Study phase. Recent news coverage has discussed the project.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
- Queue history observations through: Dec 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Colorado
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Flint Rock Solar Project, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 9073 Holman - 44200 Hillje
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- MEDIUM
- POI Substation
- Holman Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Solar queue pipeline by status
Data tables and metrics from the InfraSure database.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.