Bottom Grass Solar II (ERCOT-25INR0152) — Project Summary

Queue ID
ERCOT-25INR0152
Capacity
401.6 MW
Technology
Solar+Battery
Status
active
Location
Colorado, TX
Region
ERCOT
Developer
Flint Rock Solar Project, LLC
IA Status
Facility Study

Bottom Grass Solar II

ERCOT-25INR0152BetaActiveSolarBatteryERCOTLBNL

401.6 MW hybrid in Colorado, TX · In queue since November 2022 · Proposed COD March 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

401.6 MW

Capacity

1

Components

Solar

4 years

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 4m

Facilities Study50%
Queue EntryNov 7, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-03-01

Queue history
25INR0152 · 38 monthly ERCOT reports, Nov 2022 – Dec 2025

Projected COD moved

5 times

Mar 2025 → Mar 2028

Net change

+36 months

first report to latest

Capacity

402 MW

unchanged in the reports

Latest stage

Cancelled

last listed Dec 2025

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedNov 7, 2022
Facilities study approvedAug 4, 2025
CancelledJan 28, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Mar 1, 2028
From queue filing
Developer in saved assessment
Flint Rock Solar Project, LLC
From queue filing
Status at research time
Active
Active in the ERCOT queue at the Facility Study stage with no IA executed. One aggregator (interconnection.fyi) lists it as withdrawn, which conflicts with LBNL and two other aggregators and is unconfirmed.
Financing
Not recorded
Research sources and reasoning (5 recorded sources)

low confidence at research time

  1. infrasure.ai/project/ercot-25inr0152-bottom-grass-solar-ii
  2. interxdata.com/projects/bottom-grass-solar-ii-ercot-25inr0152/
  3. interconnection.fyi/project/ercot-25inr0152
  4. interconnection.fyi/project/ercot-23inr0082
  5. facebook.com/groups/3162400907401094/posts/3975178416123335/

Commercial operation date: Only the LBNL/ERCOT filing date (2028-03-01) is supported. The Infrasure page repeats it ('Proposed COD March 2028'), but that page appears to be generated from the same queue data. Its narrative text also says December 1, 2026, which is inconsistent. No press release or news gives an independent, financing-backed COD.

Developer: Every source names Flint Rock Solar Project, LLC, and a Facebook snippet mentions 'Flint Rock Solar, LLC'. This looks like a project shell, and no parent or operating company is identified. The sibling Bottom Grass Solar (23INR0082) is owned by 'Bottom Grass Solar Project, LLC', which fits the same shell pattern.

Status: LBNL, Infrasure and InterXData all show 'active' with IA status Facility Study. The interconnection.fyi 'withdrawn' label is a single unverified outlier and may be confused with the withdrawn sibling project Bottom Grass Solar (23INR0082). A Facebook snippet lists 'Bottom Grass Solar II - Colorado - 01/28/2026 ... Flint Rock Solar, LLC Application Phase', which hints at ongoing county-level activity but is not conclusive.

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Bottom Grass Solar II is a proposed solar generation project located in Colorado County, Texas, within the ERCOT region. The project, developed by Flint Rock Solar Project, LLC, has a total capacity of 401.6 MW.

The project is currently active in the ERCOT interconnection queue under queue ID ERCOT-25INR0152, with an entry date of November 7, 2022. The proposed commercial operation date is December 1, 2026, and the project's interconnection agreement status is currently in the Facility Study phase. Recent news coverage has discussed the project.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Dec 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Colorado

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Flint Rock Solar Project, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345kV 9073 Holman - 44200 Hillje

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
POI Substation
Holman Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.