Blue Heron BESS
201.13 MW storage in Reeves, TX · In queue since October 2022 · Proposed COD October 2028
201.13 MW
Capacity
1
Components
Battery
4y 1m
In Queue
Facility Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
6 years
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-10-11
Projected COD moved
5 times
Dec 2025 → Oct 2028
Net change
+34 months
first report to latest
Capacity
203 → 201 MW
changed in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
RWE broke ground on three Texas BESS projects totaling 450 MW, likely including Blue Heron
rwe.comLBNL queue proposed commercial operation date
interconnection.fyiResearch sources and reasoning (4 recorded sources)
medium confidence at research time
- rwe.com/en/press/rwe-clean-energy/2024-10-02-rwe-starts-construction-of-450-mw-bess-in-the-us/
- industrialinfo.com/iirenergy/industry-news/article/rwe-breaks-ground-on-three-texas-bess-projects--335235
- ess-news.com/2024/10/03/texas-set-for-1-35-gwh-of-large-scale-bess/
- interconnection.fyi/project/ercot-25inr0146
Commercial operation date: LBNL queue snapshot shows proposed COD of 2028-03-31. No independent news sources provide an alternative date; RWE press releases mention groundbreaking on three Texas BESS projects in Oct 2024 but do not name Blue Heron specifically or provide project-specific COD targets.
Developer: LBNL filing entity is 'Blue Heron BESS, LLC' (project shell). RWE press release (Oct 2024) announces groundbreaking on three Texas BESS projects totaling 450 MW; Blue Heron (201 MW) is consistent with being one of these three projects under RWE's portfolio, indicating RWE Clean Energy is the operating parent.
Status: LBNL status is 'active' with IA status 'Facility Study'. RWE's Oct 2, 2024 press release states construction started on three Texas BESS projects (450 MW combined); Blue Heron's 201 MW capacity fits this portfolio, suggesting transition from development to construction phase.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Blue Heron BESS is a proposed 201.08 MW battery storage project located in Reeves County, Texas. The project, developed by Blue Heron BESS, LLC, is interconnected within the ERCOT region under queue ID ERCOT-25INR0146. It entered the interconnection queue on October 24, 2022, and has a proposed commercial operation date of March 31, 2028. The project's interconnection status is currently in the Facility Study phase.
The proposed project consists of 201.08 MW of battery storage capacity. Recent news coverage indicates industry interest in the development.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Reeves
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Blue Heron BESS, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138kV MANSON (1094) - Riverton (11083)
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.