Blue Heron BESS
Type
Entity Briefing
Entity
Blue Heron BESS
State
TN
Technology
battery
Generated
2026-10-06T15:08:15.132Z

Briefing on Blue Heron BESS

Entity Briefing
Generated Oct 6, 2026·Dataset freshness not reported
201 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-03-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Blue Heron BESS is a 201 MW Battery project in Texas, currently active.

Blue Heron BESS, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-03-31.

Queue ID
ERCOT-25INR0146
Location
Reeves, Texas
Technology
Battery
Developer
Blue Heron BESS, LLC
Market / region
ERCOT
Point of interconnection
Tap 138kV MANSON (1094) - Riverton (11083)

What stands out

1

Blue Heron BESS is a 201 MW Battery project in Texas with status active.

2

Blue Heron BESS, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-03-31.

Market and operating context

Queue date
2022-10-24
Proposed COD
2028-03-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Blue Heron BESS — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0146
LocationReeves, Texas
TechnologyBattery
DeveloperBlue Heron BESS, LLC
Market / regionERCOT
Point of interconnectionTap 138kV MANSON (1094) - Riverton (11083)
Queue date2022-10-24
Proposed COD2028-03-31