August Draw Solar (ERCOT-25INR0112) — Project Summary

Queue ID
ERCOT-25INR0112
Capacity
250 MW
Technology
Solar
Status
active
Location
Reeves, TX
Region
ERCOT
Developer
August Draw Solar Holdings, LLC
IA Status
IA Executed

August Draw Solar

ERCOT-25INR0112BetaActiveSolarERCOTLBNL + Live

250 MW generation in Reeves, TX · In queue since September 2022 · Proposed COD June 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

250 MW

Capacity

1

Components

Solar

4y 2m

In Queue

IA Executed

IA Phase

Signed Sep 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

3 years

IA → COD

2y 9m

Total Duration

3 years

Construction75%
Queue EntrySep 15, 2022

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementSep 12, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Started, IA

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2028-06-27

Queue history
25INR0112 · 39 monthly ERCOT reports, Jul 2023 – Sep 2026

Projected COD moved

3 times

Mar 2025 → Jun 2028

Net change

+39 months

first report to latest

Capacity

250 MW

unchanged in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedSep 15, 2022
Interconnection agreement signedSep 12, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest activityproduct_announcementLightsource bp · 2025-08-15

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Jun 27, 2028
From queue filing
Developer in saved assessment
August Draw Solar Holdings, LLC
From queue filing
Status at research time
Active
Active — IA executed September 2025 with AEP Texas, FIS pending per ERCOT queue
Financing
Not recorded
Ownership history
  1. —·DBR (entity name unclear)→August Draw Solar, LLCreevescounty.org

Milestones in this assessment

IA executedSep 12, 2025Latest in this assessment

ERCOT Standard Generation Interconnection Agreement executed with AEP Texas, filed with Texas PUC October 2025

interchange.puc.texas.gov
Research sources and reasoning (3 recorded sources)

low confidence at research time

  1. interchange.puc.texas.gov/search/documents/?controlNumber=35077&itemNumber=2273
  2. reevescounty.org/Home/Components/News/News/535/134?curm=6&cury=2026&npage=2
  3. ercotqueue.com/project/25INR0112

Commercial operation date: Only LBNL queue data provides a COD target of June 2028. No news sources or press releases discuss project timeline or construction schedule.

Developer: LBNL filing entity is August Draw Solar Holdings, LLC. No news sources identify a parent company or operating entity. Reeves County tax abatement notice references 'August Draw Solar, LLC, formerly known as DBR' suggesting possible prior entity name but no current parent identified.

Status: LBNL shows 'active' status with IA executed 2025-09-12. Texas PUC filing confirms ERCOT Standard Generation Interconnection Agreement between AEP Texas and August Draw Solar Holdings filed October 2025, corroborating active interconnection process.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

August Draw Energy is a proposed 250 MW solar generation project located in Reeves County, Texas. Developed by DBR Solar, LLC, the project is interconnected within the ERCOT region under queue ID ERCOT-25INR0112. The project entered the interconnection queue on September 15, 2022, and has a proposed commercial operation date of June 27, 2028. Its interconnection status is currently in the Facility Study phase.

The August Draw Energy project has been mentioned in recent news coverage related to industry and development.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Reeves

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

August Draw Solar Holdings, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 138kV 60207 Verhalen – 60808 Hoefs Road

Data Source

LBNL + Live

DeveloperCypress Creek RenewablesESS News · 2025-10-21
ApplicantEl Paso ElectricEl Paso Matters · 2025-01-27
CompanyLightsource bpLightsource bp · 2025-08-15
AgencyTexas Public Utility CommissionEl Paso Matters · 2025-01-27
RulingProposed ruleEl Paso Matters · 2025-01-27
TransactionProject financingESS News · 2025-10-21
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (4)Beta

Last updated 2026-04-09

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.