Briefing on August Draw Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
250 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2028-06-27
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

August Draw Solar is a 250 MW Solar project in Texas, currently active.

August Draw Solar Holdings, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-06-27.

Queue ID
ERCOT-25INR0112
Location
Reeves, Texas
Technology
Solar
Developer
August Draw Solar Holdings, LLC
Market / region
ERCOT
Point of interconnection
Tap 138kV 60207 Verhalen – 60808 Hoefs Road

What stands out

1

August Draw Solar is a 250 MW Solar project in Texas with status active.

2

August Draw Solar Holdings, LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2028-06-27.

4

Latest linked story: “Cypress Creek Renewables closes on 200 MWh Sundance solar-plus-storage hybrid” (ESS News, 2025-10-21).

Market and operating context

Queue date
2022-09-15
Proposed COD
2028-06-27
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

August Draw Solar — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0112
LocationReeves, Texas
TechnologySolar
DeveloperAugust Draw Solar Holdings, LLC
Market / regionERCOT
Point of interconnectionTap 138kV 60207 Verhalen – 60808 Hoefs Road
Queue date2022-09-15
Proposed COD2028-06-27