August Draw Solar is a 250 MW Solar project in Texas, currently active.
August Draw Solar Holdings, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-06-27.
- Queue ID
- ERCOT-25INR0112
- Location
- Reeves, Texas
- Technology
- Solar
- Developer
- August Draw Solar Holdings, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 138kV 60207 Verhalen – 60808 Hoefs Road
What stands out
August Draw Solar is a 250 MW Solar project in Texas with status active.
August Draw Solar Holdings, LLC is the reported developer.
The reported queue phase is IA Executed; proposed COD is 2028-06-27.
Latest linked story: “Cypress Creek Renewables closes on 200 MWh Sundance solar-plus-storage hybrid” (ESS News, 2025-10-21).
Market and operating context
- Queue date
- 2022-09-15
- Proposed COD
- 2028-06-27
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.