Reis Solar
105.48 MW generation in Atascosa, TX · In queue since June 2022 · Proposed COD August 2027
105.48 MW
Capacity
1
Components
Solar
4y 5m
In Queue
Facility Study
IA Phase
COD target: 2027
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
5y 2m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-08-03
Projected COD moved
2 times
Jan 2025 → Aug 2027
Net change
+31 months
first report to latest
Capacity
105 MW
unchanged in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
Entered ERCOT interconnection queue as 25INR0082
interconnection.fyiResearch sources and reasoning (6 recorded sources)
low confidence at research time
- interconnection.fyi/project/ercot-25inr0082
- aterio.io/insights/us-energy-projects/ep/reis-solar-park-project
- gem.wiki/Reis_Solar_Park_solar_farm
- renewablesinfo.org/project/ercot-25inr0082-reis-solar
- mbrweb.ferc.gov/SearchlkpEIA/Index?page=806
- eia.gov/electricity/monthly/xls/table_6_05.xlsx
Commercial operation date: Only LBNL queue snapshot provides a COD target of August 2027. No press releases, financing announcements, or construction updates found in search results to validate or contradict this date.
Developer: LBNL filing entity is 'Greenalia Solar Power Reis LLC' (project-specific LLC). Aterio and GEM.wiki sources identify parent company as 'Greenalia', a Spanish renewable energy developer using standard project-LLC structure.
Status: LBNL status is 'active' with IA status at 'Facility Study' stage. EIA MBR filing confirms regulatory approvals received but project not yet under construction. No public announcements of groundbreaking or financing.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Reis Solar project is a proposed 105.48 MW solar generation facility in Atascosa County, Texas. Developed by Greenalia Solar Power Reis LLC, the project consists of 105.48 MW of solar photovoltaic generation. It is listed in the ERCOT interconnection queue as entry ERCOT-25INR0082, with a queue entry date of June 2, 2022, and a proposed commercial operation date of August 3, 2027. The project's interconnection agreement status is currently in the Facility Study phase.
The proposed project is linked to the existing Reis Solar Park operating plant (EIA ID 67564). Interconnection will be at a tap into the 138 kV line from Choke Canyon AEP to San Miguel Gen. The Reis Solar project has been the subject of recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Atascosa
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Greenalia Solar Power Reis LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tapping into 138 kV line (5689) Choke Canyon AEP to (5902) San Miguel Gen
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- SAN_SANMIGG1
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Reis Solar
Data-driven briefing on Reis Solar — fleet, generation, financial, and news signals.
Greenalia Solar Power Blackwelder Ranch
Data-driven briefing on Greenalia Solar Power — fleet, generation, financial, and news signals.
RP SCG Texas Solar
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.