Reis Solar (ERCOT-25INR0082) — Project Summary

Queue ID
ERCOT-25INR0082
Capacity
105.48 MW
Technology
Solar
Status
active
Location
Atascosa, TX
Region
ERCOT
Developer
Greenalia Solar Power Reis LLC
IA Status
Facility Study

Reis Solar

ERCOT-25INR0082BetaActiveSolarERCOTLBNL + Live

105.48 MW generation in Atascosa, TX · In queue since June 2022 · Proposed COD August 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

105.48 MW

Capacity

1

Components

Solar

4y 5m

In Queue

Facility Study

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 2m

Facilities Study50%
Queue EntryJun 2, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-08-03

Queue history
25INR0082 · 49 monthly ERCOT reports, Sep 2022 – Sep 2026

Projected COD moved

2 times

Jan 2025 → Aug 2027

Net change

+31 months

first report to latest

Capacity

105 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJun 2, 2022

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Aug 3, 2027
From queue filing
Developer in saved assessment
Greenalia
Filed as Greenalia Solar Power Reis LLC
Status at research time
Active
Active — Facility Study phase per LBNL, no construction or financing announcements found
Financing
Not recorded

Milestones in this assessment

IA executedJun 2022Latest in this assessment

Entered ERCOT interconnection queue as 25INR0082

interconnection.fyi
Research sources and reasoning (6 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/ercot-25inr0082
  2. aterio.io/insights/us-energy-projects/ep/reis-solar-park-project
  3. gem.wiki/Reis_Solar_Park_solar_farm
  4. renewablesinfo.org/project/ercot-25inr0082-reis-solar
  5. mbrweb.ferc.gov/SearchlkpEIA/Index?page=806
  6. eia.gov/electricity/monthly/xls/table_6_05.xlsx

Commercial operation date: Only LBNL queue snapshot provides a COD target of August 2027. No press releases, financing announcements, or construction updates found in search results to validate or contradict this date.

Developer: LBNL filing entity is 'Greenalia Solar Power Reis LLC' (project-specific LLC). Aterio and GEM.wiki sources identify parent company as 'Greenalia', a Spanish renewable energy developer using standard project-LLC structure.

Status: LBNL status is 'active' with IA status at 'Facility Study' stage. EIA MBR filing confirms regulatory approvals received but project not yet under construction. No public announcements of groundbreaking or financing.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Reis Solar project is a proposed 105.48 MW solar generation facility in Atascosa County, Texas. Developed by Greenalia Solar Power Reis LLC, the project consists of 105.48 MW of solar photovoltaic generation. It is listed in the ERCOT interconnection queue as entry ERCOT-25INR0082, with a queue entry date of June 2, 2022, and a proposed commercial operation date of August 3, 2027. The project's interconnection agreement status is currently in the Facility Study phase.

The proposed project is linked to the existing Reis Solar Park operating plant (EIA ID 67564). Interconnection will be at a tap into the 138 kV line from Choke Canyon AEP to San Miguel Gen. The Reis Solar project has been the subject of recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Atascosa

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Greenalia Solar Power Reis LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tapping into 138 kV line (5689) Choke Canyon AEP to (5902) San Miguel Gen

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
HIGH
Nearest Node (Estimated)
SAN_SANMIGG1

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.