Briefing/projectactive
Reis Solar is a 105 MW Solar project in Texas, currently active.
Greenalia Solar Power Reis LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-08-03.
- Queue ID
- ERCOT-25INR0082
- Location
- Atascosa, Texas
- Technology
- Solar
- Developer
- Greenalia Solar Power Reis LLC
- Market / region
- ERCOT
- Point of interconnection
- Tapping into 138 kV line (5689) Choke Canyon AEP to (5902) San Miguel Gen
What stands out
1
Reis Solar is a 105 MW Solar project in Texas with status active.
2
Greenalia Solar Power Reis LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2027-08-03.
Market and operating context
- Queue date
- 2022-06-02
- Proposed COD
- 2027-08-03
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.