Peregrine BESS 2 (ERCOT-25INR0078) — Project Summary

Queue ID
ERCOT-25INR0078
Capacity
150 MW
Technology
Solar+Battery
Status
withdrawn
Location
Goliad, TX
Region
ERCOT
Developer
CED Development Inc.
IA Status
Facility Study

Peregrine BESS 2

ERCOT-25INR0078BetaWithdrawnBatteryBatteryERCOTLBNL + Live

150 MW generation in Goliad, TX · In queue since August 2022 · Proposed COD July 2027

Withdrawn from the ERCOT queue in September 2026, according to ERCOT's queue (Oct 2026).

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

150 MW

Capacity

1

Components

Battery

4y 3m

In Queue

Facility Study

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 11m

Queue EntryAug 5, 2022

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Commercial Operation

Proposed COD: 2027-07-01

WithdrawnWithdrawn

Project withdrew from interconnection queue

Queue history
25INR0078 · 49 monthly ERCOT reports, Aug 2022 – Aug 2026

Projected COD moved

1 time

May 2025 → Jul 2027

Net change

+26 months

first report to latest

Capacity

150 MW

unchanged in the reports

Latest stage

Cancelled

last listed Aug 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedAug 5, 2022
CancelledSep 14, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity
as of 2y 2m ago

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest milestonespecial use permit approved · 2024-09-24Community Impact | News · 2024-09-27

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
—
Developer in saved assessment
Consolidated Edison Development Inc.
Filed as CED Development Inc.
Status at research time
Cancelled
Cancelled — EIA master database lists project as cancelled; no recent construction or financing announcements found
Financing
Cancelled

Milestones in this assessment

Withdrawn

EIA master database lists project status as cancelled

lorenz-g.github.io
Permit approvedSep 24, 2024Latest in this assessment

Special use permit approved by League City (note: this appears to be a different Peregrine project in League City, not the Goliad County BESS 2)

communityimpact.com
Research sources and reasoning (5 recorded sources)

medium confidence at research time

  1. lorenz-g.github.io/tesla-megapack-tracker/gov-us-eia.html
  2. mbrweb.ferc.gov/SearchlkpEIA/Index?page=757
  3. gridinfo.com/consolidated-edison-development-inc
  4. communityimpact.com/houston/bay-area/government/2024/09/25/battery-storage-facility-coming-to-league-city/
  5. img.electricalmarketing.com/files/base/ebm/electricalmarketing/document/2024/11/672d30a9d97ec15bd9ee2622-all_bess_projects.xlsx?dl=672d30a9d97ec15bd9ee2622-all_bess_projects.xlsx

Commercial operation date: LBNL proposes 2027-07-01 COD, but EIA data (Result 10) shows project status as 'cancelled' as of their dataset. No recent news confirms construction timeline or updated COD target. Project appears withdrawn or suspended.

Developer: LBNL filing uses 'CED Development Inc.' (shell LLC). News sources (Result 6) and EIA records (Results 9, 11, 12) consistently identify operating company as 'Peregrine Energy' or 'Peregrine Energy Solutions', but FERC/EIA master records show parent as 'Consolidated Edison Development Inc.' CED is Con Edison's development subsidiary.

Status: While LBNL shows 'active' in Facility Study phase, EIA's official generator database (Result 10) explicitly lists 'Peregrine BESS 2' as 'cancelled'. No contradicting recent news of project advancement found.

Project lifecycle
as of 2024-09-27
OperationalNoCommunity Impact | News · 2024-09-27
TechnologyBatteryCommunity Impact | News · 2024-09-27
DeveloperPeregrine EnergyCommunity Impact | News · 2024-09-27
Permit decisionGrantedCommunity Impact | News · 2024-09-27

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Peregrine BESS 2 project is a proposed 150 MW battery energy storage system located in Goliad County, Texas. Developed by CED Development Inc., the project consists of a single 150 MW battery component. It is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0078, with an interconnection queue date of August 5, 2022.

The proposed commercial operation date for Peregrine BESS 2 is July 1, 2027. The project's interconnection status is currently in the Facility Study phase, and its point of interconnection is the 8673 RAPTOR7A 345kV location. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Aug 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Goliad

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

CED Development Inc.

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

8673 RAPTOR7A 345kV

Data Source

LBNL + Live

DeveloperPeregrine EnergyCommunity Impact | News · 2024-09-27
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.