Wetzel BESS (ERCOT-24INR0544) — Project Summary

Queue ID
ERCOT-24INR0544
Capacity
185.57 MW
Technology
Battery
Status
active
Location
Brown, TX
Region
ERCOT
Developer
Brown ESS, LLC
IA Status
Facility Study

Wetzel BESS

ERCOT-24INR0544BetaActiveBatteryERCOTLBNL + Live

185.57 MW storage in Brown, TX · In queue since March 2023 · Proposed COD September 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

185.57 MW

Capacity

1

Components

Battery

3y 4m

In Queue

Facility Study

IA Phase

COD target: 2028

Interconnection

Total Duration

5y 6m

Facilities Study50%
Queue EntryMar 27, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-09-09

Cross-source intelligence
Beta
Low confidence·4 sources·as of 2026-06-01
Expected COD
Sep 2028
From queue filing
Developer
Brown ESS, LLC
From queue filing
Status
Active
Active — Facility Study phase, no public construction or financing announcements
Financing
Unannounced
About

The Wetzel BESS project is a proposed 185.57 MW battery storage project located in Brown County, Texas. Developed by Brown ESS, LLC, the project entered the ERCOT interconnection queue as entry 24INR0544 on March 27, 2023. The current interconnection status is listed as Facility Study, with a proposed commercial operation date of September 9, 2028.

The Wetzel BESS project has appeared in recent news coverage regarding energy storage development in Texas. It is a standalone battery project with no linked operating plant.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Brown

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Brown ESS, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 138kV 1654 Zephyr – 1655 Brownwood Switch

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Wetzel BESS
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.