Briefing on Wetzel BESS

Entity Briefing
Generated Oct 5, 2026·Dataset freshness not reported
186 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-09-09
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Wetzel BESS is a 186 MW Battery project in Texas, currently active.

Brown ESS, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-09-09.

Queue ID
ERCOT-24INR0544
Location
Brown, Texas
Technology
Battery
Developer
Brown ESS, LLC
Market / region
ERCOT
Point of interconnection
Tap 138kV 1654 Zephyr – 1655 Brownwood Switch

What stands out

1

Wetzel BESS is a 186 MW Battery project in Texas with status active.

2

Brown ESS, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-09-09.

Market and operating context

Queue date
2023-03-27
Proposed COD
2028-09-09
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Wetzel BESS — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0544
LocationBrown, Texas
TechnologyBattery
DeveloperBrown ESS, LLC
Market / regionERCOT
Point of interconnectionTap 138kV 1654 Zephyr – 1655 Brownwood Switch
Queue date2023-03-27
Proposed COD2028-09-09