Kinney County Energy
101.2 MW storage in Kinney, TX · In queue since March 2023 · Proposed COD May 2027
101.2 MW
Capacity
1
Components
Battery
3y 8m
In Queue
Facility Study
IA Phase
COD target: 2027
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 2m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-05-15
Projected COD moved
1 time
Sep 2025 → May 2027
Net change
+20 months
first report to latest
Capacity
101 MW
unchanged in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
Entered ERCOT queue 24INR0541, Facility Study stage
cleanview.coResearch sources and reasoning (3 recorded sources)
low confidence at research time
- cleanview.co/power-projects/planned/battery-storage-projects/texas/24INR0541/kinney-county-energy
- cleanview.co/power-projects/developers/hexagon-energy
- interconnection.fyi/projects/state/TX/kinney-county
Commercial operation date: LBNL proposes 2027-05-15 COD. No news or press releases found specific to Kinney County Energy project to validate or contradict this date. Search results primarily covered Cypress Creek's Zier project in nearby Brackettville, not this project.
Developer: LBNL filing entity is 'Kinney County Energy, LLC' (project-specific shell). Cleanview database lists this project under Hexagon Energy's development pipeline, identifying Hexagon as the parent developer operating the shell LLC.
Status: LBNL status is 'active' at Facility Study stage. No news of construction start, financing, or withdrawal found. Project appears to be in early interconnection-study phase.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Kinney County Energy is a proposed 101.2 MW battery storage project in Kinney County, Texas. The project, being developed by Kinney County Energy, LLC, is interconnected within the ERCOT region under queue ID ERCOT-24INR0541. It entered the interconnection queue on March 27, 2023, and has a proposed commercial operation date of May 15, 2027. The project's interconnection status is currently in the Facility Study phase.
The Kinney County Energy project has been mentioned in recent news articles related to grid and development topics.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Kinney
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Kinney County Energy, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138kV 8252 Brackett4A - 78255 L_PINTCR8_1Y
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26