Kinney County Energy (ERCOT-24INR0541) — Project Summary

Queue ID
ERCOT-24INR0541
Capacity
101.2 MW
Technology
Battery
Status
active
Location
Kinney, TX
Region
ERCOT
Developer
Kinney County Energy, LLC
IA Status
Facility Study

Kinney County Energy

ERCOT-24INR0541BetaActiveBatteryERCOTLBNL + Live

101.2 MW storage in Kinney, TX · In queue since March 2023 · Proposed COD May 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

101.2 MW

Capacity

1

Components

Battery

3y 8m

In Queue

Facility Study

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 2m

Facilities Study50%
Queue EntryMar 27, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-05-15

Queue history
24INR0541 · 35 monthly ERCOT reports, Nov 2023 – Sep 2026

Projected COD moved

1 time

Sep 2025 → May 2027

Net change

+20 months

first report to latest

Capacity

101 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMar 27, 2023

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity
as of 2y 6m ago

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest milestoneCOD achieved · 2024-05-02Solar Power World · 2024-05-06

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
2027
From queue filing
Developer in saved assessment
Hexagon Energy
Filed as Kinney County Energy, LLC
Status at research time
Active
Active — Facility Study stage, early-stage development with 2027 target
Financing
Not recorded

Milestones in this assessment

IA executedMar 2023Latest in this assessment

Entered ERCOT queue 24INR0541, Facility Study stage

cleanview.co
Research sources and reasoning (3 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/battery-storage-projects/texas/24INR0541/kinney-county-energy
  2. cleanview.co/power-projects/developers/hexagon-energy
  3. interconnection.fyi/projects/state/TX/kinney-county

Commercial operation date: LBNL proposes 2027-05-15 COD. No news or press releases found specific to Kinney County Energy project to validate or contradict this date. Search results primarily covered Cypress Creek's Zier project in nearby Brackettville, not this project.

Developer: LBNL filing entity is 'Kinney County Energy, LLC' (project-specific shell). Cleanview database lists this project under Hexagon Energy's development pipeline, identifying Hexagon as the parent developer operating the shell LLC.

Status: LBNL status is 'active' at Facility Study stage. No news of construction start, financing, or withdrawal found. Project appears to be in early interconnection-study phase.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Kinney County Energy is a proposed 101.2 MW battery storage project in Kinney County, Texas. The project, being developed by Kinney County Energy, LLC, is interconnected within the ERCOT region under queue ID ERCOT-24INR0541. It entered the interconnection queue on March 27, 2023, and has a proposed commercial operation date of May 15, 2027. The project's interconnection status is currently in the Facility Study phase.

The Kinney County Energy project has been mentioned in recent news articles related to grid and development topics.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Kinney

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Kinney County Energy, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 138kV 8252 Brackett4A - 78255 L_PINTCR8_1Y

Data Source

LBNL + Live

DeveloperCypress Creek RenewablesSolar Power World · 2024-05-06
TransactionProject financingEnergetica India Magazine · 2022-09-07
Deal value$216.0MEnergetica India Magazine · 2022-09-07
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (2)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.