Kinney County Energy is a 101 MW Battery project in Texas, currently active.
Kinney County Energy, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-05-15.
- Queue ID
- ERCOT-24INR0541
- Location
- Kinney, Texas
- Technology
- Battery
- Developer
- Kinney County Energy, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 138kV 8252 Brackett4A - 78255 L_PINTCR8_1Y
What stands out
Kinney County Energy is a 101 MW Battery project in Texas with status active.
Kinney County Energy, LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2027-05-15.
Latest linked story: “Cypress Creek wraps up 208-MW solar + storage project for ERCOT” (Solar Power World, 2024-05-06).
Market and operating context
- Queue date
- 2023-03-27
- Proposed COD
- 2027-05-15
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.