Timber Cove Solar SLF
100.5 MW hybrid in Freestone, TX · In queue since May 2023 · Proposed COD June 2027
100.5 MW
Capacity
1
Components
Solar
3y 6m
In Queue
Facility Study
IA Phase
COD target: 2027
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 1m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-06-01
Projected COD moved
3 times
Dec 2024 → Jun 2027
Net change
+30 months
first report to latest
Capacity
101 MW
unchanged in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Research sources and reasoning (4 recorded sources)
low confidence at research time
- cleanview.co/power-projects/planned/solar-farms/texas/24INR0532/timber-cove-solar-slf
- interconnection.fyi/project/ercot-24inr0532
- ercotqueue.com/project/24INR0532
- ercotqueue.com/developer/freestone-solar-llc
Commercial operation date: Only LBNL queue data provides a COD target of April 2027. No independent news sources or press releases confirm or update this date.
Developer: All sources consistently identify 'Freestone Solar, LLC' as the developer. No parent company or operating entity is mentioned in any search results, suggesting this is the actual developer rather than a shell LLC.
Status: LBNL status is 'active' with IA status at 'Facility Study'. Multiple queue-tracking sources confirm the project remains active with no IA signed.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Timber Cove Solar SLF is a proposed 100.5 MW solar generation project located in Freestone County, Texas. Developed by Freestone Solar, LLC, the project consists of 100.5 MW of solar photovoltaic generation. It is listed in the ERCOT interconnection queue as entry ERCOT-24INR0532, with a queue entry date of May 22, 2023, and a proposed commercial operation date of April 1, 2027. The project's interconnection status is currently in the Facility Study phase.
The proposed project is linked to the existing Timber Cove Solar operating plant (EIA plant ID 66922). The point of interconnection is Tap 138 kV 212 Winkler - 3510 Pin Oak. The project has appeared in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Freestone
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Freestone Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138 kV 212 Winkler - 3510 Pin Oak
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- FREC
- POI Substation
- Richland Chambers Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Timber Cove Solar SLF
Data-driven briefing on Timber Cove Solar SLF — fleet, generation, financial, and news signals.
Timber Cove Solar
Data-driven briefing on Timber Cove Solar — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.