Briefing/projectactive
Timber Cove Solar SLF is a 101 MW Solar+Battery project in Texas, currently active.
Freestone Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-04-01.
- Queue ID
- ERCOT-24INR0532
- Location
- Freestone, Texas
- Technology
- Solar+Battery
- Developer
- Freestone Solar, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 138 kV 212 Winkler - 3510 Pin Oak
What stands out
1
Timber Cove Solar SLF is a 101 MW Solar+Battery project in Texas with status active.
2
Freestone Solar, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2027-04-01.
Market and operating context
- Queue date
- 2023-05-22
- Proposed COD
- 2027-04-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.