White Oak King Wind (ERCOT-24INR0508) — Project Summary

Queue ID
ERCOT-24INR0508
Capacity
606.5 MW
Technology
Wind
Status
active
Location
King, TX
Region
ERCOT
Developer
KSK Wind Farm 1, LLC
IA Status
Facility Study

White Oak King Wind

ERCOT-24INR0508BetaActiveWindERCOTLBNL + Live

606.5 MW generation in King, TX · In queue since March 2023 · Proposed COD August 2030

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

606.5 MW

Capacity

1

Components

Wind

3y 8m

In Queue

Facility Study

IA Phase

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

7y 5m

Facilities Study50%
Queue EntryMar 9, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-08-31

Queue history
24INR0508 · 43 monthly ERCOT reports, Feb 2023 – Sep 2026

Projected COD moved

4 times

Nov 2024 → Aug 2030

Net change

+69 months

first report to latest

Capacity

607 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMar 9, 2023
On ERCOT's inactive listNov 2025 – Nov 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity
as of 15y 9m ago

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest milestonebegan operating · 2009The Texas Tribune · 2011-02-11

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Aug 31, 2030
From queue filing
Developer in saved assessment
White Oak Energy, LLC
Filed as KSK Wind Farm 1, LLC
Status at research time
Active
Active in the ERCOT queue at the Facility Study stage with no IA date. No evidence of construction, permitting approvals, or withdrawal.
Financing
Not recorded
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. infrasure.ai/project/ercot-24inr0508-white-oak-king-wind
  2. cleanview.co/power-projects/planned/wind-farms/texas/24INR0508/white-oak-king-wind-
  3. interconnection.fyi/project/ercot-24inr0508
  4. gridstatus.io/interconnection-queue/ix_ercot_a38383d9

Commercial operation date: Only the LBNL proposed COD (2030-08-31) exists. Cleanview's 'Expected online 2030' looks derived from the same queue data, so it is not an independent signal. No developer press release or financing-backed date was found.

Developer: LBNL lists the project-style LLC 'KSK Wind Farm 1, LLC'. Infrasure says the project is 'Developed by White Oak Energy, LLC', which is consistent with the project name but comes from a single aggregator, so it is weakly corroborated. The news-extracted 'Iberdrola Renewables' value is about the Kenedy Ranch Wind Farm, a different, already-operating 2009 project in Texas, and was discarded as a mismatch.

Status: LBNL shows 'active', and GridStatus and interconnection.fyi also list it as active in the ERCOT queue. The news-extracted 'online/operational' status belongs to the unrelated Kenedy Ranch project and does not apply.

Project lifecycle
as of 2011-02-11
PhaseOnlineThe Texas Tribune · 2011-02-11
OperationalYesThe Texas Tribune · 2011-02-11
TechnologyWindThe Texas Tribune · 2011-02-11
DeveloperIberdrola RenewablesThe Texas Tribune · 2011-02-11

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The White Oak King Wind project is a proposed 606.5 MW wind generation facility in King County, Texas. Developed by White Oak Energy, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0508, with a queue entry date of March 9, 2023. The proposed commercial operation date is August 31, 2030.

The project's interconnection status is currently in the Facility Study phase. The point of interconnection is to the 345 kV Gauss bus (#60701). The White Oak King Wind project has been mentioned in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

King

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

KSK Wind Farm 1, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

345 kV Gauss ( Bus # 60701)

Data Source

LBNL + Live

DeveloperIberdrola RenewablesThe Texas Tribune · 2011-02-11
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.