White Oak King Wind
606.5 MW generation in King, TX · In queue since March 2023 · Proposed COD August 2030
606.5 MW
Capacity
1
Components
Wind
3y 8m
In Queue
Facility Study
IA Phase
COD target: 2030
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
7y 5m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-08-31
Projected COD moved
4 times
Nov 2024 → Aug 2030
Net change
+69 months
first report to latest
Capacity
607 MW
unchanged in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (4 recorded sources)
low confidence at research time
- infrasure.ai/project/ercot-24inr0508-white-oak-king-wind
- cleanview.co/power-projects/planned/wind-farms/texas/24INR0508/white-oak-king-wind-
- interconnection.fyi/project/ercot-24inr0508
- gridstatus.io/interconnection-queue/ix_ercot_a38383d9
Commercial operation date: Only the LBNL proposed COD (2030-08-31) exists. Cleanview's 'Expected online 2030' looks derived from the same queue data, so it is not an independent signal. No developer press release or financing-backed date was found.
Developer: LBNL lists the project-style LLC 'KSK Wind Farm 1, LLC'. Infrasure says the project is 'Developed by White Oak Energy, LLC', which is consistent with the project name but comes from a single aggregator, so it is weakly corroborated. The news-extracted 'Iberdrola Renewables' value is about the Kenedy Ranch Wind Farm, a different, already-operating 2009 project in Texas, and was discarded as a mismatch.
Status: LBNL shows 'active', and GridStatus and interconnection.fyi also list it as active in the ERCOT queue. The news-extracted 'online/operational' status belongs to the unrelated Kenedy Ranch project and does not apply.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The White Oak King Wind project is a proposed 606.5 MW wind generation facility in King County, Texas. Developed by White Oak Energy, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0508, with a queue entry date of March 9, 2023. The proposed commercial operation date is August 31, 2030.
The project's interconnection status is currently in the Facility Study phase. The point of interconnection is to the 345 kV Gauss bus (#60701). The White Oak King Wind project has been mentioned in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
King
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
KSK Wind Farm 1, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
345 kV Gauss ( Bus # 60701)
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26
View all articlesTOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Geothermal queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.