Hana Springs BESS
100.8 MW storage in Lampasas, TX · In queue since November 2022 · Proposed COD May 2028
100.8 MW
Capacity
1
Components
Battery
4 years
In Queue
Facility Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
5y 6m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-05-15
Projected COD moved
3 times
Aug 2024 → May 2028
Net change
+45 months
first report to latest
Capacity
101 MW
unchanged in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Research sources and reasoning (7 recorded sources)
low confidence at research time
- lampasasdispatchrecord.com/news/lometa-couple-sound-alarm-over-battery-storage-plant
- cleanview.co/planned-battery-projects/TX/24INR0494/hana-springs-bess
- interconnection.fyi/project/ercot-24inr0494
- interconnectionfyi.substack.com/p/interconnection-weekly-project-updates-7d3
- modo-content-service-prod.s3.amazonaws.com/media/reports/2024/05/22/ERCOT_BESS_buildout_report_May_2024_YwMZT0X.xlsx
- ercotqueue.com/project/24INR0494
- ercotqueue.com/developer/black-mountain-energy-storage-ii-llc
Commercial operation date: LBNL queue snapshot shows proposed COD of May 2028. Multiple aggregator sites (Cleanview, Interconnection.fyi) echo this date, but no independent press releases or developer announcements confirm or update it. The 2028 target remains unchallenged by newer sources.
Developer: All sources consistently reference 'Black Mountain Energy Storage II LLC' as the developer. No parent company, operating entity, or ownership change is mentioned in any search result. This appears to be the actual project entity rather than a shell LLC.
Status: LBNL reports 'active' status at Facility Study stage with no IA signed. Ercotqueue.com corroborates 'No IA' status as of April 2026. No construction, financing, or permitting announcements found in search results.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Hana Springs BESS project is a proposed 100.8 MW battery storage project located in Lampasas County, Texas. Developed by Black Mountain Energy Storage II LLC, the project entered the ERCOT interconnection queue as ERCOT-24INR0494 on November 23, 2022. The current interconnection status is listed as Facility Study, with a proposed commercial operation date of May 15, 2028.
The project consists of 100.8 MW of battery storage capacity. It is currently listed as active within the ERCOT interconnection queue. The point of interconnection is the 7064 LAMPASAS 138KV substation. The Hana Springs BESS project has appeared in recent news coverage regarding energy storage development in Texas.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Lampasas
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Black Mountain Energy Storage II LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
7064 LAMPASAS 138KV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- MEDIUM
- POI Substation
- Lampasas Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.