Hana Springs BESS (ERCOT-24INR0494) — Project Summary

Queue ID
ERCOT-24INR0494
Capacity
100.8 MW
Technology
Battery
Status
active
Location
Lampasas, TX
Region
ERCOT
Developer
Black Mountain Energy Storage II LLC
IA Status
Facility Study

Hana Springs BESS

ERCOT-24INR0494BetaActiveBatteryERCOTLBNL + Live

100.8 MW storage in Lampasas, TX · In queue since November 2022 · Proposed COD May 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

100.8 MW

Capacity

1

Components

Battery

4 years

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 6m

Facilities Study50%
Queue EntryNov 23, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-05-15

Queue history
24INR0494 · 47 monthly ERCOT reports, Nov 2022 – Sep 2026

Projected COD moved

3 times

Aug 2024 → May 2028

Net change

+45 months

first report to latest

Capacity

101 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedNov 23, 2022

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
May 2028
From queue filing
Developer in saved assessment
Black Mountain Energy Storage II LLC
From queue filing
Status at research time
Active
Active — Facility Study stage per LBNL; no IA executed; ercotqueue.com assigns 5% build probability based on early-stage status
Financing
Not recorded
Research sources and reasoning (7 recorded sources)

low confidence at research time

  1. lampasasdispatchrecord.com/news/lometa-couple-sound-alarm-over-battery-storage-plant
  2. cleanview.co/planned-battery-projects/TX/24INR0494/hana-springs-bess
  3. interconnection.fyi/project/ercot-24inr0494
  4. interconnectionfyi.substack.com/p/interconnection-weekly-project-updates-7d3
  5. modo-content-service-prod.s3.amazonaws.com/media/reports/2024/05/22/ERCOT_BESS_buildout_report_May_2024_YwMZT0X.xlsx
  6. ercotqueue.com/project/24INR0494
  7. ercotqueue.com/developer/black-mountain-energy-storage-ii-llc

Commercial operation date: LBNL queue snapshot shows proposed COD of May 2028. Multiple aggregator sites (Cleanview, Interconnection.fyi) echo this date, but no independent press releases or developer announcements confirm or update it. The 2028 target remains unchallenged by newer sources.

Developer: All sources consistently reference 'Black Mountain Energy Storage II LLC' as the developer. No parent company, operating entity, or ownership change is mentioned in any search result. This appears to be the actual project entity rather than a shell LLC.

Status: LBNL reports 'active' status at Facility Study stage with no IA signed. Ercotqueue.com corroborates 'No IA' status as of April 2026. No construction, financing, or permitting announcements found in search results.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Hana Springs BESS project is a proposed 100.8 MW battery storage project located in Lampasas County, Texas. Developed by Black Mountain Energy Storage II LLC, the project entered the ERCOT interconnection queue as ERCOT-24INR0494 on November 23, 2022. The current interconnection status is listed as Facility Study, with a proposed commercial operation date of May 15, 2028.

The project consists of 100.8 MW of battery storage capacity. It is currently listed as active within the ERCOT interconnection queue. The point of interconnection is the 7064 LAMPASAS 138KV substation. The Hana Springs BESS project has appeared in recent news coverage regarding energy storage development in Texas.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Lampasas

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Black Mountain Energy Storage II LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

7064 LAMPASAS 138KV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
POI Substation
Lampasas Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.