Briefing/projectactive
Hana Springs BESS is a 101 MW Battery project in Texas, currently active.
Black Mountain Energy Storage II LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-05-15.
- Queue ID
- ERCOT-24INR0494
- Location
- Lampasas, Texas
- Technology
- Battery
- Developer
- Black Mountain Energy Storage II LLC
- Market / region
- ERCOT
- Point of interconnection
- 7064 LAMPASAS 138KV
What stands out
1
Hana Springs BESS is a 101 MW Battery project in Texas with status active.
2
Black Mountain Energy Storage II LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-05-15.
Market and operating context
- Queue date
- 2022-11-23
- Proposed COD
- 2028-05-15
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.