Exodus BESS (ERCOT-24INR0459) — Project Summary

Queue ID
ERCOT-24INR0459
Capacity
201.36 MW
Technology
Battery
Status
withdrawn
Location
Caldwell, TX
Region
ERCOT
Developer
Exodus Solar LLC
IA Status
Facility Study

Exodus BESS

ERCOT-24INR0459BetaWithdrawnBatteryERCOTLBNL + Live

201.36 MW storage in Caldwell, TX · In queue since July 2023 · Proposed COD December 2027

Withdrawn from the ERCOT queue in September 2026, according to ERCOT's queue (Oct 2026).

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

201.36 MW

Capacity

1

Components

Battery

3y 4m

In Queue

Facility Study

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 5m

Queue EntryJul 10, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Commercial Operation

Proposed COD: 2027-12-01

WithdrawnWithdrawn

Project withdrew from interconnection queue

Queue history
24INR0459 · 39 monthly ERCOT reports, Jun 2023 – Aug 2026

Projected COD moved

4 times

Sep 2025 → Dec 2027

Net change

+27 months

first report to latest

Capacity

202 → 201 MW

changed in the reports

Latest stage

Cancelled

last listed Aug 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJul 10, 2023
CancelledSep 1, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Dec 2027
From queue filing
Developer in saved assessment
GCI Holdings
Filed as Exodus Solar LLC
Status at research time
Active
Active — Facility Study stage, no IA executed yet. ERCOTqueue estimates 5% build probability.
Financing
Not recorded
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/battery-storage-projects/texas/24INR0459/exodus-bess
  2. interconnection.fyi/project/ercot-24inr0459
  3. ercotqueue.com/project/24INR0459
  4. cleanview.co/developer/gci-holdings

Commercial operation date: LBNL queue filing shows December 2027 COD. Multiple aggregator sites (Cleanview, interconnection.fyi) echo this date, but no independent press releases or developer announcements found to validate or update it.

Developer: LBNL filing entity is 'Exodus Solar LLC' (project-specific shell). Cleanview developer pages attribute this project to 'GCI Holdings' as the parent operating company.

Status: LBNL status is 'active' at Facility Study stage. No news of withdrawal, construction start, or financing. ERCOTqueue flags low build-chance (5%), suggesting early-stage speculative project.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Exodus BESS project is a proposed 201.36 MW battery storage project located in Caldwell County, Texas. Developed by Exodus Solar LLC, the project consists entirely of battery storage. It is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0459, with a queue entry date of July 10, 2023. The proposed commercial operation date is December 1, 2027, and the project's interconnection agreement status is currently in the Facility Study phase.

The Exodus BESS project has been mentioned in recent news coverage related to the electric grid.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Aug 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Caldwell

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Exodus Solar LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345kV 7040 Austrop – 7042 Zorn

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-04-09

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.