Briefing/projectactive
Exodus BESS is a 201 MW Battery project in Texas, currently active.
Exodus Solar LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-12-01.
- Queue ID
- ERCOT-24INR0459
- Location
- Caldwell, Texas
- Technology
- Battery
- Developer
- Exodus Solar LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345kV 7040 Austrop – 7042 Zorn
What stands out
1
Exodus BESS is a 201 MW Battery project in Texas with status active.
2
Exodus Solar LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2027-12-01.
4
Latest linked story: “Elon Musk’s Tesla building giant battery to plug into Texas grid” (Al Jazeera, 2021-03-08).
Market and operating context
- Queue date
- 2023-07-10
- Proposed COD
- 2027-12-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.