FRIENDSWOOD ENERGY GENCO (ERCOT-24INR0456) — Project Summary

Queue ID
ERCOT-24INR0456
Capacity
143.7 MW
Technology
Gas
Status
active
Location
Harris, TX
Region
ERCOT
Developer
Tejas Power Generation LLC
IA Status
IA Executed

FRIENDSWOOD ENERGY GENCO

ERCOT-24INR0456BetaActiveGasERCOTLBNL

143.7 MW generation in Harris, TX · In queue since December 2022 · Proposed COD February 2026

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

143.7 MW

Capacity

1

Components

Gas

3y 11m

In Queue

IA Executed

IA Phase

Signed Apr 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 4m

IA → COD

1y 10m

Total Duration

1y 4m

Schedule

9 months past proposed COD

Construction75%
Queue EntryDec 7, 2022

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementApr 23, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 24–48 months

Commercial Operation

Proposed COD: 2026-02-14

Queue history
24INR0456 · 36 monthly ERCOT reports, May 2023 – Apr 2026

Projected COD moved

9 times

Jun 2024 → May 2026

Net change

+23 months

first report to latest

Capacity

144 MW

unchanged in the reports

Latest stage

Commercial operation

last listed Apr 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedDec 7, 2022
Facilities study approvedMar 21, 2024
Interconnection agreement signedApr 23, 2024
Approved for energizationJul 16, 2025
Approved for synchronizationOct 24, 2025
Approved for commercial operationMay 21, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity
as of 9y 10m ago

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest milestoneCOD achieved · Q2 2017The Business Journals · 2017-01-25
Expected CODQ2 2017The Business Journals · 2017-01-25

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
2017
Differs from queue: Feb 14, 2026
Developer in saved assessment
Tejas Power Generation LLC
Sources agreed at research time
Status at research time
Active
Active — Original 121 MW facility operational since 2017; LBNL queue entry likely represents expansion/repower project ('Friendswood II') targeting 2026
Financing
Not recorded
Ownership history
  1. 2019·Friendswood Energy Genco, LLC→Tejas Power Generation LLCgridinfo.com

Milestones in this assessment

COD target2017

Original 121 MW Friendswood Energy Center targeted Q2 2017 commercial operation

bizjournals.com
IA executedApr 23, 2024Latest in this assessment

Interconnection agreement executed for Friendswood II project with CenterPoint Energy

interchange.puc.texas.gov
Research sources and reasoning (5 recorded sources)

high confidence at research time

  1. bizjournals.com/houston/news/2017/01/25/houston-power-plant-to-enter-service-this-summer.html
  2. gridinfo.com/plant/friendswood-energy/60468
  3. ferc.gov/sites/default/files/2020-05/nov-energy-infrastructure_0.pdf
  4. interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=35077&ItemMatch=Equal&FilingParty=centerpoint&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending
  5. ercotqueue.com/developer/tejas-power-generation-llc

Commercial operation date: Multiple sources confirm the Friendswood Energy Center came online in 2017 (FERC report states 'is online', Business Journals reported Q2 2017 target). LBNL's 2026-05-08 proposed COD represents a different project phase or expansion ('Friendswood II Project' mentioned in PUC filings), not the original 121 MW facility.

Developer: LBNL filing entity 'Tejas Power Generation LLC' matches the operating company name across all sources (GridInfo, ercotqueue.com, renewablesinfo.org). No shell-LLC structure detected.

Status: LBNL status 'active' with IA executed 2024-04-23 is accurate for the queue position. However, a facility with this name already operates at this site since 2017, suggesting the queue entry is for additional capacity or repowering.

Project lifecycle
as of 2017-01-25
PhaseOnlineThe Business Journals · 2017-01-25
OperationalNoThe Business Journals · 2017-01-25
TechnologygasThe Business Journals · 2017-01-25

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Friendswood Energy Genco project is a proposed 143.7 MW gas-fired generation project located in Harris County, Texas. The project is being developed by Tejas Power Generation LLC. It entered the ERCOT interconnection queue as queue ID ERCOT-24INR0456 on December 7, 2022, with a proposed commercial operation date of March 21, 2026. The project's interconnection agreement (IA) was executed on April 23, 2024.

The proposed project is linked to the existing Friendswood Energy operating plant (EIA plant ID 60468). The project has been mentioned in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Apr 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Harris

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Tejas Power Generation LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

47170 H O CLARKE 138KV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
POI Substation
H

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.