FRIENDSWOOD ENERGY GENCO
143.7 MW generation in Harris, TX · In queue since December 2022 · Proposed COD February 2026
143.7 MW
Capacity
1
Components
Gas
3y 11m
In Queue
IA Executed
IA Phase
Signed Apr 2024
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
1y 4m
IA → COD
1y 10m
Total Duration
1y 4m
Schedule
9 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 24–48 months
Proposed COD: 2026-02-14
Projected COD moved
9 times
Jun 2024 → May 2026
Net change
+23 months
first report to latest
Capacity
144 MW
unchanged in the reports
Latest stage
Commercial operation
last listed Apr 2026
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.
Cross-source intelligence
Experimental assessment saved at the research date. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
- 2019·Friendswood Energy Genco, LLC→Tejas Power Generation LLCgridinfo.com
Milestones in this assessment
Original 121 MW Friendswood Energy Center targeted Q2 2017 commercial operation
bizjournals.comInterconnection agreement executed for Friendswood II project with CenterPoint Energy
interchange.puc.texas.govResearch sources and reasoning (5 recorded sources)
high confidence at research time
- bizjournals.com/houston/news/2017/01/25/houston-power-plant-to-enter-service-this-summer.html
- gridinfo.com/plant/friendswood-energy/60468
- ferc.gov/sites/default/files/2020-05/nov-energy-infrastructure_0.pdf
- interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=35077&ItemMatch=Equal&FilingParty=centerpoint&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending
- ercotqueue.com/developer/tejas-power-generation-llc
Commercial operation date: Multiple sources confirm the Friendswood Energy Center came online in 2017 (FERC report states 'is online', Business Journals reported Q2 2017 target). LBNL's 2026-05-08 proposed COD represents a different project phase or expansion ('Friendswood II Project' mentioned in PUC filings), not the original 121 MW facility.
Developer: LBNL filing entity 'Tejas Power Generation LLC' matches the operating company name across all sources (GridInfo, ercotqueue.com, renewablesinfo.org). No shell-LLC structure detected.
Status: LBNL status 'active' with IA executed 2024-04-23 is accurate for the queue position. However, a facility with this name already operates at this site since 2017, suggesting the queue entry is for additional capacity or repowering.
About
Generated Apr 10, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Friendswood Energy Genco project is a proposed 143.7 MW gas-fired generation project located in Harris County, Texas. The project is being developed by Tejas Power Generation LLC. It entered the ERCOT interconnection queue as queue ID ERCOT-24INR0456 on December 7, 2022, with a proposed commercial operation date of March 21, 2026. The project's interconnection agreement (IA) was executed on April 23, 2024.
The proposed project is linked to the existing Friendswood Energy operating plant (EIA plant ID 60468). The project has been mentioned in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
- Queue history observations through: Apr 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Harris
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Tejas Power Generation LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
47170 H O CLARKE 138KV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- MEDIUM
- POI Substation
- H
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26
View all articlesFRIENDSWOOD ENERGY GENCO
Data-driven briefing on FRIENDSWOOD ENERGY GENCO — fleet, generation, financial, and news signals.
Friendswood Energy
Data-driven briefing on Friendswood Energy — fleet, generation, financial, and news signals.
ATI
Data-driven briefing on ATI — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.