High Plains Storage (ERCOT-24INR0419) — Project Summary

Queue ID
ERCOT-24INR0419
Capacity
157.7 MW
Technology
Battery
Status
active
Location
Harris, TX
Region
ERCOT
Developer
ROBP Holdings, LLC
IA Status
Facility Study

High Plains Storage

ERCOT-24INR0419BetaActiveBatteryERCOTLBNL + Live

157.7 MW storage in Harris, TX · In queue since September 2022 · Proposed COD May 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

157.7 MW

Capacity

1

Components

Battery

4y 2m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 8m

Facilities Study50%
Queue EntrySep 2, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-05-30

Queue history
24INR0419 · 50 monthly ERCOT reports, Aug 2022 – Sep 2026

Projected COD moved

5 times

Jun 2025 → May 2028

Net change

+35 months

first report to latest

Capacity

150 → 158 MW

changed in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedSep 2, 2022

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Oct 29, 2026
Differs from queue: May 30, 2028
Developer in saved assessment
ROBP Holdings, LLC
From queue filing
Status at research time
Active
Active — Facility Study stage, proposed COD shifted to Oct 2026 per recent queue update
Financing
Not recorded

Milestones in this assessment

COD targetOct 29, 2026Latest in this assessment

Proposed completion date updated from Oct 2025 to Oct 2026

interconnectionfyi.substack.com
Research sources and reasoning (5 recorded sources)

medium confidence at research time

  1. cleanview.co/power-projects/planned/battery-storage-projects/texas/24INR0419/high-plains-storage
  2. interconnection.fyi/project/ercot-24inr0419
  3. modo-content-service-prod.s3.amazonaws.com/media/reports/2024/05/22/ERCOT_BESS_buildout_report_May_2024_YwMZT0X.xlsx
  4. interconnectionfyi.substack.com/p/interconnectionfyi-weekly-digest
  5. ercotqueue.com/project/24INR0419

Commercial operation date: Interconnection.fyi weekly digest (Dec 2024) reports proposed completion changed from Oct 2025 to Oct 2026, reflecting a 1.5-year acceleration from LBNL's May 2028 date. This is a more recent update than the LBNL queue snapshot.

Developer: No alternative developer name found in research. ROBP Holdings, LLC appears consistently across LBNL, Cleanview, and AWS buildout pipeline sources with no parent company identified.

Status: LBNL status 'active' confirmed by multiple queue-tracking sources. Interconnection.fyi reports COD timeline adjustment in Dec 2024, indicating ongoing project development.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The High Plains Storage project is a proposed 157.7 MW battery energy storage system located in Harris County, Texas. The project, developed by ROBP Holdings, LLC, is currently in the ERCOT interconnection queue as entry ERCOT-24INR0419, with a queue entry date of September 2, 2022. Its proposed commercial operation date is May 30, 2028, and its interconnection status is currently in the Facility Study phase.

The High Plains Storage development project has been mentioned in recent news coverage related to the energy industry.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Harris

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

ROBP Holdings, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

45880 Hockley 138kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
MEDIUM
POI Substation
Hockley Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.