Query
High Plains Storage
Type
Entity Briefing
Entity
High Plains Storage
State
MI
Generated
2026-10-20T01:03:58.118Z

Briefing on High Plains Storage

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
158 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-05-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

High Plains Storage is a 158 MW Battery project in Texas, currently active.

ROBP Holdings, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-05-30.

Queue ID
ERCOT-24INR0419
Location
Harris, Texas
Technology
Battery
Developer
ROBP Holdings, LLC
Market / region
ERCOT
Point of interconnection
45880 Hockley 138kV

What stands out

1

High Plains Storage is a 158 MW Battery project in Texas with status active.

2

ROBP Holdings, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-05-30.

Market and operating context

Queue date
2022-09-02
Proposed COD
2028-05-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

High Plains Storage — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0419
LocationHarris, Texas
TechnologyBattery
DeveloperROBP Holdings, LLC
Market / regionERCOT
Point of interconnection45880 Hockley 138kV
Queue date2022-09-02
Proposed COD2028-05-30