Briefing/projectactive
High Plains Storage is a 158 MW Battery project in Texas, currently active.
ROBP Holdings, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-05-30.
- Queue ID
- ERCOT-24INR0419
- Location
- Harris, Texas
- Technology
- Battery
- Developer
- ROBP Holdings, LLC
- Market / region
- ERCOT
- Point of interconnection
- 45880 Hockley 138kV
What stands out
1
High Plains Storage is a 158 MW Battery project in Texas with status active.
2
ROBP Holdings, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-05-30.
Market and operating context
- Queue date
- 2022-09-02
- Proposed COD
- 2028-05-30
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.