Middlebrook Solar Limited Liability Company (ERCOT-24INR0418) — Project Summary

Queue ID
ERCOT-24INR0418
Capacity
316.19 MW
Technology
Solar+Battery
Status
active
Location
Nacogdoches, TX
Region
ERCOT
Developer
Middlebrook Solar LLC
IA Status
IA Executed

Middlebrook Solar Limited Liability Company

ERCOT-24INR0418BetaActiveSolarBatteryERCOTLBNL

316.19 MW hybrid in Nacogdoches, TX · In queue since October 2022 · Proposed COD August 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

316.19 MW

Capacity

1

Components

Solar

4y 1m

In Queue

IA Executed

IA Phase

Signed Jul 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

2y 9m

IA → COD

2y 1m

Total Duration

2y 9m

Construction75%
Queue EntryOct 18, 2022

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementJul 21, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2027-08-13

Queue history
24INR0418 · 37 monthly ERCOT reports, Oct 2022 – Dec 2025

Projected COD moved

4 times

May 2025 → Aug 2027

Net change

+27 months

first report to latest

Capacity

609 → 316 MW

changed in the reports

Latest stage

Cancelled

last listed Dec 2025

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedOct 18, 2022
Interconnection agreement signedJul 21, 2025
CancelledJan 21, 2026
On ERCOT's inactive listFeb 2025 – Mar 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Aug 13, 2027
From queue filing
Developer in saved assessment
Middlebrook Solar LLC
From queue filing
Status at research time
IA Executed
Active in the ERCOT queue with an IA executed 2025-07-21. No construction start or financing close has been publicly reported. One aggregator (interconnection.fyi) lists it as withdrawn, which conflicts with LBNL and the other aggregators.
Financing
Not recorded

Milestones in this assessment

IA executedJul 21, 2025Latest in this assessment

Interconnection agreement executed for the 316.19 MW Middlebrook solar+battery project (signed Jul 2025).

infrasure.ai
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. infrasure.ai/project/ercot-24inr0418-middlebrook-solar-limited-liability-company
  2. interconnection.fyi/project/ercot-24inr0418
  3. interxdata.com/projects/middlebrook-solar-limited-liability-company-ercot-24inr0418/
  4. texas-biz.com/co/middlebrook-solar-llc

Commercial operation date: No news or press-release evidence gives a COD. The aggregator pages (infrasure.ai: 'Proposed COD: 2027-08-13') repeat the LBNL/ERCOT queue data, so they are not independent confirmation. One infrasure snippet says June 30, 2027, but it is internally inconsistent and still within the same year.

Developer: Only the project-LLC name appears. Texas business registries show Middlebrook Solar LLC as a foreign LLC formed 2022-04-12 and currently active. No source names a parent or operating company, so a shell-vs-parent distinction cannot be established.

Status: LBNL shows an executed IA (2025-07-21) and active status. interxdata and infrasure agree. The interconnection.fyi 'withdrawn' flag is uncorroborated and is likely stale or erroneous. infrasure also mentions a 'Facility Study' phase, which conflicts with the executed IA.

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Middlebrook Solar is a proposed 316.19 MW solar generation project located in Nacogdoches County, Texas. The project, developed by Middlebrook Solar LLC, is in the ERCOT interconnection queue as entry ERCOT-24INR0418, with a queue entry date of October 18, 2022. The proposed commercial operation date is June 30, 2027.

The project's interconnection status is currently in the Facility Study phase. The point of interconnection is the Tap Stryker [3109] - Lufkin [3117] 345 kV line. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Dec 2025.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Nacogdoches

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Middlebrook Solar LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345kV 3109 Stryker - 3117 Lufkin

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.