Sierra Diablo Energy Storage (ERCOT-24INR0417) — Project Summary

Queue ID
ERCOT-24INR0417
Capacity
203.81 MW
Technology
Battery
Status
active
Location
Van Zandt, TX
Region
ERCOT
Developer
SIERRA DIABLO ENERGY STORAGE LLC
IA Status
Facility Study

Sierra Diablo Energy Storage

ERCOT-24INR0417BetaActiveBatteryERCOTLBNL

203.81 MW storage in Van Zandt, TX · In queue since August 2022 · Proposed COD April 2026

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

203.81 MW

Capacity

1

Components

Battery

4y 3m

In Queue

Facility Study

IA Phase

COD target: 2026

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 8m

Schedule

7 months past proposed COD

Facilities Study50%
Queue EntryAug 5, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-04-20

Queue history
24INR0417 · 46 monthly ERCOT reports, Jul 2022 – Apr 2026

Projected COD moved

3 times

Dec 2024 → Apr 2026

Net change

+16 months

first report to latest

Capacity

204 MW

unchanged in the reports

Latest stage

Cancelled

last listed Apr 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedAug 5, 2022
CancelledMay 18, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Apr 20, 2026
From queue filing
Developer in saved assessment
SIERRA DIABLO ENERGY STORAGE LLC
From queue filing
Status at research time
Active
Active — in Facility Study phase per ERCOT queue, no public construction or financing announcements found
Financing
Not recorded

Milestones in this assessment

IA executedAug 2022Latest in this assessment

Project entered ERCOT queue in Facility Study phase

cleanview.co
Research sources and reasoning (3 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/battery-storage-projects/texas/24INR0417/sierra-diablo-energy-storage
  2. interconnection.fyi/project/ercot-24inr0417
  3. modo-content-service-prod.s3.amazonaws.com/media/reports/2024/05/22/ERCOT_BESS_buildout_report_May_2024_YwMZT0X.xlsx

Commercial operation date: LBNL queue snapshot shows proposed COD of 2026-04-20. No news articles or press releases found discussing this specific Van Zandt County project's timeline or developer announcements. Search results primarily returned unrelated Diablo Canyon nuclear plant articles and generic BESS aggregator listings.

Developer: Only source is LBNL filing entity. No press releases, corporate announcements, or news coverage found identifying a parent company or operating entity behind this project LLC. Search yielded no developer attribution beyond the legal entity name.

Status: LBNL shows 'active' status in Facility Study phase. No news coverage found indicating construction start, financing close, or project withdrawal.

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Sierra Diablo Energy Storage is a proposed 203.81 MW battery storage project located in Van Zandt County, Texas. The developer is Sierra Diablo Energy Storage LLC. This project is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0417, with a queue entry date of August 5, 2022, and a proposed commercial operation date of April 20, 2026. Its interconnection status is currently in the Facility Study phase.

The proposed project consists of 203.81 MW of battery storage capacity. Sierra Diablo Energy Storage has been the subject of recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Apr 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Van Zandt

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

SIERRA DIABLO ENERGY STORAGE LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 138kv 1698 Sulphur Springs Switch – 3174 Canton Switch

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.