Briefing on Sierra Diablo Energy Storage

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
204 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2026-04-20
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Sierra Diablo Energy Storage is a 204 MW Battery project in Texas, currently active.

SIERRA DIABLO ENERGY STORAGE LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2026-04-20.

Queue ID
ERCOT-24INR0417
Location
Van Zandt, Texas
Technology
Battery
Developer
SIERRA DIABLO ENERGY STORAGE LLC
Market / region
ERCOT
Point of interconnection
Tap 138kv 1698 Sulphur Springs Switch – 3174 Canton Switch

What stands out

1

Sierra Diablo Energy Storage is a 204 MW Battery project in Texas with status active.

2

SIERRA DIABLO ENERGY STORAGE LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2026-04-20.

Market and operating context

Queue date
2022-08-05
Proposed COD
2026-04-20
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Sierra Diablo Energy Storage — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0417
LocationVan Zandt, Texas
TechnologyBattery
DeveloperSIERRA DIABLO ENERGY STORAGE LLC
Market / regionERCOT
Point of interconnectionTap 138kv 1698 Sulphur Springs Switch – 3174 Canton Switch
Queue date2022-08-05
Proposed COD2026-04-20