Trelas (ERCOT-24INR0416) — Project Summary

Queue ID
ERCOT-24INR0416
Capacity
200.83 MW
Technology
Battery
Status
active
Location
Mcculloch, TX
Region
ERCOT
Developer
Trelasol, LLC
IA Status
Facility Study

Trelas

ERCOT-24INR0416BetaActiveBatteryERCOTLBNL

200.83 MW storage in Mcculloch, TX · In queue since September 2022 · Proposed COD May 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

200.83 MW

Capacity

1

Components

Battery

4y 2m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 8m

Facilities Study50%
Queue EntrySep 2, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-05-01

Queue history
24INR0416 · 45 monthly ERCOT reports, Aug 2022 – Apr 2026

Projected COD moved

3 times

Mar 2024 → May 2028

Net change

+50 months

first report to latest

Capacity

203 → 201 MW

changed in the reports

Latest stage

Cancelled

last listed Apr 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedSep 2, 2022
CancelledMay 19, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
May 2028
From queue filing
Developer in saved assessment
—
From queue filing
Status at research time
Active
Active — Facility Study stage per LBNL; project appears to be marketed for sale as of January 2026 per Fractal Energy newsletter
Financing
Not recorded

Milestones in this assessment

Ownership changeJan 2026Latest in this assessment

Project Trelas listed for sale by Fractal Energy Storage Consultants with NBO submission deadline in March 2026

energystorageconsultants.com
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/battery-storage-projects/texas/24INR0416/trelas
  2. interconnection.fyi/project/ercot-24inr0416
  3. ercotqueue.com/project/24INR0416
  4. energystorageconsultants.com/newsletter/Fractal-Energy-Storage-News-Jan-2026.pdf

Commercial operation date: LBNL queue snapshot shows proposed COD of May 2028. Multiple aggregator sites (Cleanview, interconnection.fyi) echo this date, but no independent developer announcements or press releases found to validate or update it.

Developer: LBNL filing entity is 'Trelasol, LLC' — appears to be a project-specific LLC. No press releases, corporate websites, or news coverage identify a parent operating company. January 2026 Fractal Energy newsletter mentions 'Project Trelas' sale process, suggesting the project may be marketed for acquisition, but no buyer or parent entity is named.

Status: LBNL status is 'active' with IA status 'Facility Study'. Fractal Energy Storage Consultants newsletter (Jan 2026) lists 'Project Trelas Opportunity' with NBO submission in March, indicating the project is being actively marketed for acquisition rather than developed by original sponsor.

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The proposed Trelas project is a 200.83 MW battery storage development in McCulloch County, Texas. The project, developed by Trelasol, LLC, is located within the ERCOT region and consists entirely of battery storage.

The project is listed in the ERCOT interconnection queue as entry ERCOT-24INR0416, with a queue entry date of September 2, 2022. Its proposed commercial operation date is May 1, 2028, and its interconnection agreement status is currently in the Facility Study phase. The point of interconnection is the 76006 Bow Wood 345kV Bus.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Apr 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Mcculloch

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Trelasol, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

76006 Bow Wood 345kV Bus

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
POI Substation
Bow Wood Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.